Wilbarger County, Texas: solar, wind, and storage permits
Who to call and what to check for a solar, wind, or battery storage project in Wilbarger County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.
Who handles property records and taxes in Wilbarger County?
The Wilbarger County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.
Wilbarger County directory (Texas Comptroller)Lease rates and rollback taxes
Which TCEQ office covers Wilbarger County?
TCEQ Region 3, Abilene
1977 Industrial Blvd, Abilene TX 79602-7833
Main line: 325-698-9674 · Spills, 24 hours: 800-832-8224
Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.
TCEQ region directoryConstruction stormwater permit
Does Wilbarger County have zoning or a solar permit?
Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.
What energy projects are proposed in Wilbarger County?
ERCOT's August 2026 interconnection report lists 21 proposed energy projects in Wilbarger County (9 solar, 1 wind, 6 battery storage and 5 gas), about 8,506 MW in all. 8 of the 21 have a signed interconnection agreement, and 1 has been energized or approved to connect.
Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.
Scroll the table sideways to see every column.
| Project and connection point | Developer | Type | MW | Projected in service | Stage |
|---|---|---|---|---|---|
| Blue Summit Energy Storage61001 JIM TREECE 345kV | NextEra Energy Interconnection Holdings, LLC | Battery storage | 100.0 | Jul 2026 | Approved to connect |
| Adamstown Solartap 345kV 1730 West Krum - 6111 Riley Ckt 2 | Adams Creek Solar Project, LLC | Solar | 250.9 | Aug 2027 | Signed; security posted |
| Dundee West Wind345 kV Riley Substation (#6101); AEP | Felix 2, LLC | Wind | 146.5 | Dec 2027 | Signed; security posted |
| Limitless Energy Hub IITap 345kV 6101 RILEY7A - 60505 EDITHCLA7B. | Limitless Energy Hub II LLC | Gas combined cycle | 1,238.2 | Dec 2028 | Signed; security posted |
| Felix East SolarThe 345 kV Riley Substation (#6101); AEP | Felix 1, LLC | Solar | 200.9 | Dec 2028 | Signed; security posted |
| Felix North Solar6101 Riley 345kV | Crescent Solar, LLC | Solar | 201.0 | Dec 2028 | Signed; security posted |
| Felix West Solar6101 Riley 345 kV | Felix 1, LLC | Solar | 200.9 | Dec 2028 | Signed; security posted |
| Limitless Energy Hub ITap 345kV 6101 RILEY7A - 60505 EDITHCLA7B. | Limitless Energy Hub I LLC | Gas combined cycle | 1,238.2 | Dec 2028 | Signed Dec 2025 |
| Felix StorageThe 345 kV Riley Substation (#6101); AEP | Felix 1, LLC | Battery storage (paired with solar) | 100.5 | Jul 2027 | In study |
| TEXPO6101 Riley 345 kV | Oklaunion Power Station, LLC | Gas steam turbine | 680.0 | Oct 2027 | In study |
| Wander Waters BESS61001 JIMTREEC7A 345kV | Wander Waters BESS LLC | Battery storage (stand-alone) | 303.5 | Oct 2027 | In study |
| Reunion SolarTap 345kV #60504 Tesla Road to #6111 Riley | Reunion Solar, LLC | Solar | 600.9 | Jul 2028 | In study |
| Reunion StorageTap 345kV #60504 Tesla Road to #6111 Riley | Reunion Solar, LLC | Battery storage (paired with solar) | 200.3 | Jul 2028 | In study |
| White Wing SolarTap 345 kV (#60504) Tesla - (#6111) Riley | White Wing Solar, LLC | Solar | 127.4 | Jul 2028 | In study |
| White Wing StorageTap 345 kV (#60504) Tesla - (#6111) Riley | White Wing Solar, LLC | Battery storage (paired with solar) | 130.4 | Jul 2028 | In study |
| Proteus Vernon Solar SLF6060 Vernon 138kV | Vernon Solar and Storage LLC (a Delaware LLC) | Solar | 75.0 | Feb 2029 | In study |
| Proteus Vernon Storage SLF6060 Vernon 138kV | Vernon Solar and Storage LLC (a Delaware LLC) | Battery storage (paired with solar) | Self-limiting | Feb 2029 | In study |
| Poco Trail SolarTap 345kV 6101 Riley - 1422 Bowman | Eastern Trail Solar Center, LLC | Solar | 438.8 | Apr 2029 | In study |
| Grayback SolarTap 345kV 6101 RILEY7A - 60505 EDITHCLA7B | Grayback Solar, LLC | Solar | 221.8 | Sep 2029 | In study |
| H&C WILBARGER POWER ITap 345kV 6101 RILEY7A - 60505 EDITHCLA7B | H&C WILBARGER POWER I | Gas combined cycle | 1,025.5 | Feb 2032 | In study |
| H&C WILBARGER POWER IITap 345kV 6101 RILEY7A - 60505 EDITHCLA7B | H&C WILBARGER POWER I | Gas combined cycle | 1,025.5 | Feb 2032 | In study |
Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.
Where are the flood maps for Wilbarger County?
FEMA flood maps for Wilbarger County
How does a project here connect to the grid?
Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.
Interconnection by market and utilityERCOT resource integration
What state and federal reviews can apply?
Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.
Statewide and federal contactsTexas decommissioning law
Check a specific property in Wilbarger County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 3
Archer · Baylor · Brown · Callahan · Clay · Coleman · Comanche · Cottle · Eastland · Fisher · Foard · Hardeman · Haskell · Jack · Jones · Kent · Knox · Mitchell · Montague · Nolan · Runnels · Scurry · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wichita · Young