Who to call and what to check for a solar, wind, or battery storage project in Nolan County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Nolan County?

The Nolan County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Nolan County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Nolan County?

TCEQ Region 3, Abilene
1977 Industrial Blvd, Abilene TX 79602-7833
Main line: 325-698-9674 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Nolan County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Nolan County?

ERCOT's August 2026 interconnection report lists 18 proposed energy projects in Nolan County (4 solar, 10 wind, 3 battery storage and 1 gas), about 4,441 MW in all. 6 of the 18 have a signed interconnection agreement, and 4 have been energized or approved to connect.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
Sweetwater 2 repower71050 Bitter Creek 345kVLeeward EnergyWind7.3Nov 2024Approved to connect
Trent repower1338 Eskota 138kVTRENT WIND FARM LLCWind6.4Jan 2026Approved to connect
Maryneal Wind71050 Bitter Creek 345kVMaryneal Windpower, LLCWind182.4Aug 2026Approved to connect
Champion Wind RepowerBus# 1048 - TonkawaChampion Wind Farm, LLCWind0.3Dec 2026Approved to connect
Buffalo Gap 2 Wind Repower6216 Bluff Creek 138 kVBuffalo Gap Wind Farm 2, LLCWind231.5Feb 2027Signed; security posted
Sweetwater 1 repower71050 Bitter Creek 345kVLeeward EnergyWind3.0Nov 2024Signed Oct 2002
Buzzi Maryneal Wind Project1413 SWEETCRK-9Buzzi Unicem USAWind18.0Jan 2026In study
Trailblazer BESS11420 Sweetwater East Switch 345 kVTrailblazer Infrastructure LLCBattery storage (paired with solar)262.0Dec 2027In study
Trailblazer Natural Gas Generation Plant11420 Sweetwater East Switch 345 kVTrailblazer Infrastructure LLCGas turbine1,026.0Dec 2027In study
Trailblazer Solar#11420 Sweetwater East Switch 345 kVTrailblazer Infrastructure LLCSolar323.0Dec 2027In study
Sweetwater 4 Repower<71050> <L_BITTCR5_1Y> <345kV>Sweetwater Wind 4 LLCWind421.2Feb 2029In study
Sweetwater 5 RepowerBitter Creek SubstationSweetwater Wind 5 LLCWind79.1Feb 2029In study
Harley Hand Solar11420 Sweetwater East 345kVHECTATE ENERGY HARLEY HAND SOLAR LLCSolar505.5Apr 2029In study
Harley Hand Storage11420 Sweetwater East 345kVHecate Energy Harley Hand Storage LLCBattery storage (paired with solar)503.4Apr 2029In study
Themisto SolarTap 345kV Champion Creek #1414 – Sweetwater East #11420Themisto Solar, LLCSolar301.4Jun 2029In study
Sepanta Solar10198 ESKOTA_9 138kVBREG - Belgian Renewable Energy GroupSolar218.0Sep 2029In study
Jaguarundi Energy StorageBus # 1339, Eskota 138kVPowerPulse LLCBattery storage (stand-alone)152.0Nov 2029In study
Sagebrush WindTAP 345KV 11420 SWEETWATER EAST - 11406 CENTRAL BLUFF CKT2ACE DevCo NC, LLCWind200.5Dec 2029In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Nolan County?

FEMA flood maps for Nolan County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Nolan County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 3

Archer · Baylor · Brown · Callahan · Clay · Coleman · Comanche · Cottle · Eastland · Fisher · Foard · Hardeman · Haskell · Jack · Jones · Kent · Knox · Mitchell · Montague · Runnels · Scurry · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wichita · Wilbarger · Young

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.