Who to call and what to check for a solar, wind, or battery storage project in Nolan County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.
Who handles property records and taxes in Nolan County?
The Nolan County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.
Nolan County directory (Texas Comptroller)Lease rates and rollback taxes
Which TCEQ office covers Nolan County?
TCEQ Region 3, Abilene
1977 Industrial Blvd, Abilene TX 79602-7833
Main line: 325-698-9674 · Spills, 24 hours: 800-832-8224
Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.
TCEQ region directoryConstruction stormwater permit
Does Nolan County have zoning or a solar permit?
Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.
What energy projects are proposed in Nolan County?
ERCOT's August 2026 interconnection report lists 18 proposed energy projects in Nolan County (4 solar, 10 wind, 3 battery storage and 1 gas), about 4,441 MW in all. 6 of the 18 have a signed interconnection agreement, and 4 have been energized or approved to connect.
Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.
Scroll the table sideways to see every column.
| Project and connection point | Developer | Type | MW | Projected in service | Stage |
|---|---|---|---|---|---|
| Sweetwater 2 repower71050 Bitter Creek 345kV | Leeward Energy | Wind | 7.3 | Nov 2024 | Approved to connect |
| Trent repower1338 Eskota 138kV | TRENT WIND FARM LLC | Wind | 6.4 | Jan 2026 | Approved to connect |
| Maryneal Wind71050 Bitter Creek 345kV | Maryneal Windpower, LLC | Wind | 182.4 | Aug 2026 | Approved to connect |
| Champion Wind RepowerBus# 1048 - Tonkawa | Champion Wind Farm, LLC | Wind | 0.3 | Dec 2026 | Approved to connect |
| Buffalo Gap 2 Wind Repower6216 Bluff Creek 138 kV | Buffalo Gap Wind Farm 2, LLC | Wind | 231.5 | Feb 2027 | Signed; security posted |
| Sweetwater 1 repower71050 Bitter Creek 345kV | Leeward Energy | Wind | 3.0 | Nov 2024 | Signed Oct 2002 |
| Buzzi Maryneal Wind Project1413 SWEETCRK-9 | Buzzi Unicem USA | Wind | 18.0 | Jan 2026 | In study |
| Trailblazer BESS11420 Sweetwater East Switch 345 kV | Trailblazer Infrastructure LLC | Battery storage (paired with solar) | 262.0 | Dec 2027 | In study |
| Trailblazer Natural Gas Generation Plant11420 Sweetwater East Switch 345 kV | Trailblazer Infrastructure LLC | Gas turbine | 1,026.0 | Dec 2027 | In study |
| Trailblazer Solar#11420 Sweetwater East Switch 345 kV | Trailblazer Infrastructure LLC | Solar | 323.0 | Dec 2027 | In study |
| Sweetwater 4 Repower<71050> <L_BITTCR5_1Y> <345kV> | Sweetwater Wind 4 LLC | Wind | 421.2 | Feb 2029 | In study |
| Sweetwater 5 RepowerBitter Creek Substation | Sweetwater Wind 5 LLC | Wind | 79.1 | Feb 2029 | In study |
| Harley Hand Solar11420 Sweetwater East 345kV | HECTATE ENERGY HARLEY HAND SOLAR LLC | Solar | 505.5 | Apr 2029 | In study |
| Harley Hand Storage11420 Sweetwater East 345kV | Hecate Energy Harley Hand Storage LLC | Battery storage (paired with solar) | 503.4 | Apr 2029 | In study |
| Themisto SolarTap 345kV Champion Creek #1414 – Sweetwater East #11420 | Themisto Solar, LLC | Solar | 301.4 | Jun 2029 | In study |
| Sepanta Solar10198 ESKOTA_9 138kV | BREG - Belgian Renewable Energy Group | Solar | 218.0 | Sep 2029 | In study |
| Jaguarundi Energy StorageBus # 1339, Eskota 138kV | PowerPulse LLC | Battery storage (stand-alone) | 152.0 | Nov 2029 | In study |
| Sagebrush WindTAP 345KV 11420 SWEETWATER EAST - 11406 CENTRAL BLUFF CKT2 | ACE DevCo NC, LLC | Wind | 200.5 | Dec 2029 | In study |
Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.
Where are the flood maps for Nolan County?
FEMA flood maps for Nolan County
How does a project here connect to the grid?
Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.
Interconnection by market and utilityERCOT resource integration
What state and federal reviews can apply?
Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.
Statewide and federal contactsTexas decommissioning law
Check a specific property in Nolan County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 3
Archer · Baylor · Brown · Callahan · Clay · Coleman · Comanche · Cottle · Eastland · Fisher · Foard · Hardeman · Haskell · Jack · Jones · Kent · Knox · Mitchell · Montague · Runnels · Scurry · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wichita · Wilbarger · Young