Who to call and what to check for a solar, wind, or battery storage project in Jones County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Jones County?

The Jones County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Jones County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Jones County?

TCEQ Region 3, Abilene
1977 Industrial Blvd, Abilene TX 79602-7833
Main line: 325-698-9674 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Jones County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Jones County?

ERCOT's August 2026 interconnection report lists 14 proposed energy projects in Jones County (9 solar and 5 battery storage), about 3,780 MW in all. 8 of the 14 have a signed interconnection agreement, and 3 have been energized or approved to connect.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
Crowded Star Solartap 345kV 68001 Claytonville – 68004 Phantom Hill c2 (New Substatio...Jones City Solar, LLCSolar218.8Aug 2026Approved to connect
Crowded Star Solar IItap 345kV 68001 Claytonville – 68004 Phantom Hill c2 (New Substatio...Jones City Solar II, LLCSolar189.5Sep 2026Approved to connect
Anson Solar 2existing tap 345 kV 68004 Phantom Hill stationAnson Solar Center 2, LLCSolar200.9Oct 2026Approved to connect
Tiger Solar68004 PHANTOM HILL 345KVVaca Del Sol, LLCSolar250.9Jun 2027Signed; security posted
Funston Solartap 345 kV 68000 West Shackelford – 68004 Phantom Hill Circuit 2Funston Solar LLCSolar351.1Jul 2027Signed; security posted
Crowded Star I BESS68014 Open SkyJones City Solar II, LLCBattery storage (paired with solar)202.7Jul 2027Signed; security posted
Anson BATtap 345 kV 68004 Phantom Hill stationAnson II Storage LLCBattery storage (paired with solar)153.6Dec 2027Signed; security posted
Hamby Solar6245 ABILENE ROBERTSON PRISON 138 KVAbilene GCE LLCSolar205.8Jun 2028Signed; security posted
Solara BESS 160387 Hendrick 138kVCED Development Inc.Battery storage (stand-alone)150.0Nov 2027In study
Solara BESS 260387 Hendrick 138kVCED Development Inc.Battery storage (stand-alone)150.0Nov 2027In study
Anson Solar Center, Phase IIItap 345kV 68000 WShack - 68001 ClaytonAnson Solar Center 3, LLCSolar200.0Jun 2028In study
Moccasin StorageTap 345kV #60707 Kirchhoff - #60515 Clear Crossing CKT-1ENGIE IR Holdings LLCBattery storage (paired with solar)603.1Jul 2028In study
Skeeter Solar345 kV SWEETWATER EAST (11420) - LONG CREEK (1435)Mesquite Solar, LLCSolar251.0Jun 2029In study
Hackberry Draw SolarTap 345 kV (68000) West Shackleford - (60515) Clear Crossing Ckt 2Orsted Onshore Development North America, LLCSolar653.0Apr 2030In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Jones County?

FEMA flood maps for Jones County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Jones County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 3

Archer · Baylor · Brown · Callahan · Clay · Coleman · Comanche · Cottle · Eastland · Fisher · Foard · Hardeman · Haskell · Jack · Kent · Knox · Mitchell · Montague · Nolan · Runnels · Scurry · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wichita · Wilbarger · Young

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.