Scurry County, Texas: solar, wind, and storage permits

Contacts checked 2026-09-26 · From official state and federal directories

Who to call and what to check for a solar, wind, or battery storage project in Scurry County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Scurry County?

The Scurry County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Scurry County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Scurry County?

TCEQ Region 3, Abilene
1977 Industrial Blvd, Abilene TX 79602-7833
Main line: 325-698-9674 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Scurry County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Scurry County?

ERCOT's August 2026 interconnection report lists 17 proposed energy projects in Scurry County (7 solar, 2 wind and 8 battery storage), about 5,060 MW in all. 5 of the 17 have a signed interconnection agreement, and 3 have been energized or approved to connect.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
Brazos Wind Repower1064 Sun 138kVBRAZOS WIND VENTURES, LLCWind22.4Nov 2025Approved to connect
Coyote Wind11305 Dermott 345kVCoyote WindWind242.6Aug 2026Approved to connect
Knapp BESSStation Name: KNAPPKnapp ESS Assets, LLCBattery storage (stand-alone)9.9Oct 2026Approved to connect
Maldives SolarGalvani 345 kV station (Bus #59912)Maldives Solar LLCSolar184.0Sep 2028Signed; security posted
Spectra Solar59912 Galvani 345KVSE DC DevcoSolar1,200.0Nov 2028Signed; security posted
Helion BESS59912 GALVANI 345Helion BESSBattery storage (paired with solar)100.0Sep 2027In study
Helion Solar59912 GALVANI 345Helion Solar LLCSolar100.0Oct 2027In study
Cedar Draw BESS60011 Nebula7A 345kVCedar Draw Solar LLCBattery storage (paired with solar)225.7Dec 2027In study
Cedar Draw Solar60011 Nebula7A 345kVCedar Draw Solar LLCSolar451.4Dec 2027In study
Roost Energy Storagethe Knapp Sub (bus# 1310) – Union Switch (bus# 18555)Bluff Creek Energy Storage LLCBattery storage (stand-alone)102.4Sep 2028In study
Zeus Scurry BESSMHOS 345 kV Substation (#59911)Zeus Scurry BESSBattery storage (paired with solar)1,043.1Oct 2028In study
Zeus Scurry SolarMHOS 345 kV Substation (#59911)Scurry Solar, LLCSolar503.5Oct 2028In study
Inadale BESSTap 345 kV TONKAWAW_5 (11048) – SCURCNTYS_5 (11318) Circuit #2Inadale BESS, LLCBattery storage (paired with solar)287.2Mar 2029In study
Inadale SolarTap 345 kV TONKAWAW_5 (11048) – SCURCNTYS_5 (11318) Circuit #2Inadale Solar, LLCSolar281.0Mar 2029In study
Fluvanna Max BESS SLF11305 DERMOTT 345 kVFluvanna Max Solar LLCBattery storage (paired with solar)51.8Sep 2029In study
Fluvanna Max Solar SLF11305 DERMOTT 345 kVFluvanna Max Solar LLCSolar152.7Sep 2029In study
Hide Town Energy Storage18555 Union Switch 138 kVHide Town Energy Storage LLCBattery storage (stand-alone)102.8Oct 2029In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Scurry County?

FEMA flood maps for Scurry County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Scurry County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 3

Archer · Baylor · Brown · Callahan · Clay · Coleman · Comanche · Cottle · Eastland · Fisher · Foard · Hardeman · Haskell · Jack · Jones · Kent · Knox · Mitchell · Montague · Nolan · Runnels · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wichita · Wilbarger · Young

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.