Quicksand Check

Home › Texas permits › Fisher County

Fisher County, Texas: solar, wind, and storage permits

Contacts checked 2026-09-26 · From official state and federal directories

Who to call and what to check for a solar, wind, or battery storage project in Fisher County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Fisher County?

The Fisher County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Fisher County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Fisher County?

TCEQ Region 3, Abilene
1977 Industrial Blvd, Abilene TX 79602-7833
Main line: 325-698-9674 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Fisher County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Fisher County?

ERCOT's August 2026 interconnection report lists 11 proposed energy projects in Fisher County (4 solar, 3 wind and 4 battery storage), about 3,090 MW in all. 6 of the 11 have a signed interconnection agreement, and 1 has been energized or approved to connect.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
Whitehorse Wind68001 Clayton 345kVMESQUITE STAR SPECIAL LLCWind418.9Dec 2026Approved to connect
Indigo Solartap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2Innovative Solar 245, LLCSolar150.0Sep 2027Signed; security posted
Indigo Storagetap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2Innovative Solar 245, LLCBattery storage (paired with solar)60.0Sep 2027Signed; security posted
Indigo Storage 2tap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2Innovative Solar 245, LLCBattery storage (paired with solar)60.0Sep 2027Signed; security posted
Indigo Storage 3tap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2Innovative Solar 245, LLCBattery storage (paired with solar)60.0Sep 2027Signed; security posted
Indigo Storage 4tap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2Innovative Solar 245, LLCBattery storage (paired with solar)60.0Sep 2027Signed; security posted
Indigo solar 2Tap 345KV 68001 Clayton 345KV -68000 WShack Ckt 2Indigo Solar 2Solar180.0Jul 2027In study
Indigo Solar 3Tap Line Segment Tankawa (Bus #1048) to Graham (Bus #1430)Indigo solar 3Solar800.0Nov 2028In study
Alkali Creek WindTap 345 kV BUS #1048 Tonkawa -Alkali Creek Wind, LLCWind474.4Dec 2028In study
Alkali Creek Wind 2Tap 345 kV BUS #1048 Tonkawa - BUS #11050 Dusty RoadAlkali Creek Wind, LLCWind250.3Dec 2028In study
Jenna Eco-Electric SolarTap 345 kV 1048 Tonkawa Switch - 1430 Graham SESClean Energy Holdings, LLCSolar576.3Apr 2029In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Fisher County?

FEMA flood maps for Fisher County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Fisher County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 3

Archer · Baylor · Brown · Callahan · Clay · Coleman · Comanche · Cottle · Eastland · Foard · Hardeman · Haskell · Jack · Jones · Kent · Knox · Mitchell · Montague · Nolan · Runnels · Scurry · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wichita · Wilbarger · Young

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.