Taylor County, Texas: solar, wind, and storage permits

Contacts checked 2026-09-26 · From official state and federal directories

Who to call and what to check for a solar, wind, or battery storage project in Taylor County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Taylor County?

The Taylor County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Taylor County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Taylor County?

TCEQ Region 3, Abilene
1977 Industrial Blvd, Abilene TX 79602-7833
Main line: 325-698-9674 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Taylor County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Taylor County?

ERCOT's August 2026 interconnection report lists 14 proposed energy projects in Taylor County (4 solar, 4 wind and 6 battery storage), about 3,485 MW in all. 4 of the 14 have a signed interconnection agreement, and 2 have been energized or approved to connect.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
HHGT repower Horse13+CallD7046 Kendal 345kVNexteraWind44.0Mar 2027Approved to connect
Horse13 CallD repower6216 Bluff Creek 138kVNexteraWind44.0Mar 2027Approved to connect
Buffalo Gap 1 Wind Repower6216 Bluff Creek Substation 138kVBuffalo Gap Wind Farm, LLCWind120.2Feb 2027Signed; security posted
Buffalo Gap 3 Wind Repower6216 Bluff_Creek 138kVBuffalo Gap Wind Farm 3, LLCWind168.4Feb 2027Signed; security posted
Dog Star Solar IBluff Creek (Bus #60040) to Mulberry Creek (Bus #6235) 345 kVDog Star Solar LLCSolar499.0Dec 2027In study
Dog Star Solar IIBluff Creek (Bus #60040) to Mulberry Creek (Bus #6235) 345 kVDog Star Solar LLCSolar499.0Dec 2027In study
Chimney Rock BESSTap 138kV 76317 MOORE - 76318 BUTMANTaylor ESS, LLCBattery storage (stand-alone)156.0Apr 2028In study
Summerhill BESSTap 138kv 6228 ABNTHWST4A - 6288 MULBERRY4DTaylor ESS, LLCBattery storage (stand-alone)143.0Dec 2028In study
Forts Trail BESS11406 Central Bluff Switch 345kVJC Central Bluff, LLCBattery storage (paired with solar)208.8Mar 2029In study
Forts Trail BESS 211406 Central Bluff Switch 345 kVJC Central Bluff, LLCBattery storage (paired with solar)205.5Mar 2029In study
Forts Trail Solar11406 Central Bluff Switch 345kVJC Central Bluff, LLCSolar200.8Mar 2029In study
Key City Battery Storage SLF6235 Abilene Mulberry Creek 345Key City Battery Storage LLCBattery storage (paired with solar)1.9Mar 2029In study
Key City Solar SLF6235 Abilene Mulberry Creek 345Key City Solar LLCSolar989.1Mar 2029In study
Taylor County Paul Storage6260 Abilene South Substation 138kVDM-TCP, LLCBattery storage (stand-alone)204.9Dec 2029In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Taylor County?

FEMA flood maps for Taylor County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Taylor County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 3

Archer · Baylor · Brown · Callahan · Clay · Coleman · Comanche · Cottle · Eastland · Fisher · Foard · Hardeman · Haskell · Jack · Jones · Kent · Knox · Mitchell · Montague · Nolan · Runnels · Scurry · Shackelford · Stephens · Stonewall · Throckmorton · Wichita · Wilbarger · Young

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.