Jack County, Texas: solar, wind, and storage permits
Who to call and what to check for a solar, wind, or battery storage project in Jack County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.
Who handles property records and taxes in Jack County?
The Jack County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.
Jack County directory (Texas Comptroller)Lease rates and rollback taxes
Which TCEQ office covers Jack County?
TCEQ Region 3, Abilene
1977 Industrial Blvd, Abilene TX 79602-7833
Main line: 325-698-9674 · Spills, 24 hours: 800-832-8224
Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.
TCEQ region directoryConstruction stormwater permit
Does Jack County have zoning or a solar permit?
Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.
What energy projects are proposed in Jack County?
ERCOT's August 2026 interconnection report lists 17 proposed energy projects in Jack County (4 solar, 2 wind, 9 battery storage and 2 gas), about 7,979 MW in all. 4 of the 17 have a signed interconnection agreement.
Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.
Scroll the table sideways to see every column.
| Project and connection point | Developer | Type | MW | Projected in service | Stage |
|---|---|---|---|---|---|
| Possum Kingdom BESSTap 345kV 1421 Willow Creek – 11523 Thomas Price | PK Solar, LLC | Battery storage (paired with solar) | 200.9 | Oct 2027 | Under construction |
| Possum Kingdom SolarTap 345kV 1421 Willow Creek Switch – 11523 Thomas Price | PK Solar, LLC | Solar | 262.2 | Oct 2027 | Under construction |
| O'Bannion Energy Storage1506 Long Hollow Switch 345 kV | O'Bannion Energy Storage, LLC | Battery storage (stand-alone) | 306.4 | Apr 2028 | Signed; security posted |
| Fortuna WindTap 345kV 1429 Jacksboro - 1730 WKrum | RWE Renewables Development, LLC | Wind | 295.3 | Jul 2026 | Signed Aug 2024 |
| Liberty Senate Energy Storage 11445 Burwick 345kV | Senate Solar LLC | Battery storage (stand-alone) | 207.4 | Oct 2027 | In study |
| Beitel Energy Storage579 Jack County 138kV | Brazos Energy Storage, LLC | Battery storage (stand-alone) | 200.6 | Dec 2027 | In study |
| Lightning Ridge Energy StorageTap #1429 Jacksboro Substation 345kV | Lightning Ridge Storage LLC | Battery storage (stand-alone) | 204.7 | Mar 2028 | In study |
| Dovetail Solar 1Tap 345 KV 1421 Willow Creek - 60515 Clear Crossing Ckt 2 | Hecate Energy Dovetail Solar 1 LLC | Solar | 666.1 | Apr 2028 | In study |
| Dovetail StorageTap 345 KV 1421 Willow Creek-60515 Clear Crossing CKT#2 | Hecate Energy Dovetail Storage LLC | Battery storage (paired with solar) | 508.7 | Apr 2028 | In study |
| JackGard BESS1429 Jacksboro 345kV | Jackgard BESS | Battery storage (stand-alone) | 200.6 | Apr 2028 | In study |
| Campsey Windtap 345kV 1458 Cobb - 1429 Jacksboro | RWE Clean Energy Development, LLC | Wind | 238.3 | Jun 2028 | In study |
| Wooderson Energy StorageTap 345 kV 11418 TECUMSEH- 1421 Willow Creek | Wooderson Energy Storage, LLC | Battery storage (stand-alone) | 306.4 | Sep 2028 | In study |
| Dovetail Solar 2Tap 345 KV 1421 Willow Creek - 60515 Clear Crossing | Hecate Energy Dovetail Solar 2 LLC | Solar | 666.1 | Apr 2029 | In study |
| Dovetail Solar 3Tap 345kV 1421 Willow Creek – 11523 THOMPRIC | Hecate Energy Dovetail Solar Holdings LLC | Solar | 666.1 | Apr 2029 | In study |
| Pinnington Storagetap both 345kV 1430 Graham - 1436 Parker 345kV lines | Hecate Energy Longhorn Storage LLC | Battery storage (stand-alone) | 502.7 | Apr 2029 | In study |
| Thunder Bird 1 GasTap Double circuit line between Jacksbro_5 (1429) to Willowck_5 (14... | Kalnin Ventures, LLC | Gas combined cycle | 1,272.8 | Jun 2030 | In study |
| Thunder Bird 2 GasTap Double circuit line between Jacksbro_5 (1429) to Willowck_5 (14... | Kalnin Ventures, LLC | Gas combined cycle | 1,273.8 | Jun 2031 | In study |
Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.
Where are the flood maps for Jack County?
FEMA flood maps for Jack County
How does a project here connect to the grid?
Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.
Interconnection by market and utilityERCOT resource integration
What state and federal reviews can apply?
Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.
Statewide and federal contactsTexas decommissioning law
Check a specific property in Jack County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 3
Archer · Baylor · Brown · Callahan · Clay · Coleman · Comanche · Cottle · Eastland · Fisher · Foard · Hardeman · Haskell · Jones · Kent · Knox · Mitchell · Montague · Nolan · Runnels · Scurry · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wichita · Wilbarger · Young