Who to call and what to check for a solar, wind, or battery storage project in Hardeman County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Hardeman County?

The Hardeman County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Hardeman County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Hardeman County?

TCEQ Region 3, Abilene
1977 Industrial Blvd, Abilene TX 79602-7833
Main line: 325-698-9674 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Hardeman County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Hardeman County?

ERCOT's August 2026 interconnection report lists 8 proposed energy projects in Hardeman County (4 solar, 1 wind and 3 battery storage), about 2,194 MW in all. None has a signed interconnection agreement yet.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
Tabor SolarTap 345kV 60504 Tesla - 61001 Jim TreeceQuanah Solar LLCSolar506.4Apr 2027In study
Supra WindTap #6101 Riley 7A to #60505 Edithcla 7B 345kVNextEra Energy Interconnection Holdings, LLCWind205.9Dec 2027In study
Hardeman BESS6050 PAUL 138kVQuanah BESS LLCBattery storage (stand-alone)104.0Jun 2028In study
Earthwise SolarTap 345kV 60504 Tesla - 61001 Jim TreeceQuanah Solar 2Solar370.5Dec 2028In study
Juniper Ridge BESS 1Tap EDITHCLA7B [60505] -- TESLA7A [60501] 345kV ckt2Lazy U ESS 1Battery storage (stand-alone)251.5Jun 2029In study
Juniper Ridge BESS 2Tap EDITHCLA7B [60505] -- TESLA7A [60501] ckt2Lazy U ESS 2Battery storage (stand-alone)251.5Jun 2029In study
Lazy U Solar 1Tap 345kV 60505 EDITHCLA7B - 60501 TESLA7A ckt2Lazy U Solar 1Solar252.0Jun 2029In study
Lazy U Solar 2Tap 345kV 60505 EDITHCLA7B - 60501 TESLA7A CKT2Lazy U Solar 2Solar252.0Jun 2029In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Hardeman County?

FEMA flood maps for Hardeman County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Hardeman County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 3

Archer · Baylor · Brown · Callahan · Clay · Coleman · Comanche · Cottle · Eastland · Fisher · Foard · Haskell · Jack · Jones · Kent · Knox · Mitchell · Montague · Nolan · Runnels · Scurry · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wichita · Wilbarger · Young

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.