Home › Texas permits › Wharton County
Wharton County, Texas: solar, wind, and storage permits
Who to call and what to check for a solar, wind, or battery storage project in Wharton County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.
Who handles property records and taxes in Wharton County?
The Wharton County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.
Wharton County directory (Texas Comptroller)Lease rates and rollback taxes
Which TCEQ office covers Wharton County?
TCEQ Region 12, Houston
5425 Polk St, Ste H, Houston TX 77023-1452
Main line: 713-767-3500 · Spills, 24 hours: 800-832-8224
Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.
TCEQ region directoryConstruction stormwater permit
Does Wharton County have zoning or a solar permit?
Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.
What energy projects are proposed in Wharton County?
ERCOT's August 2026 interconnection report lists 41 proposed energy projects in Wharton County (19 solar, 1 wind, 18 battery storage and 3 gas), about 8,503 MW in all. 24 of the 41 have a signed interconnection agreement, and 7 have been energized or approved to connect.
Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.
Scroll the table sideways to see every column.
| Project and connection point | Developer | Type | MW | Projected in service | Stage |
|---|---|---|---|---|---|
| TEXAS GULF SULPHUR REPOWER43340 Gulftie 138 kV | Wharton County Generation, LLC | Gas turbine | 16.1 | Mar 2025 | Approved to connect |
| PHOTON SOLAR 1 2 SLF44880 Waterh_POI_5 345kV | GulfStar Power, LLC | Solar | 235.7 | May 2026 | Approved to connect |
| PHOTON SOLAR 3 SLF44880 Waterh_POI_5 345kV | GulfStar Power, LLC | Solar | 110.0 | May 2026 | Approved to connect |
| PHOTON SOLAR 4 SLF44880 Waterh_POI_5 345kV | GulfStar Power, LLC | Solar | 106.0 | May 2026 | Approved to connect |
| Danish Fields Solar44200 Hillje 345kV | Danish Fields Solar, LLC | Solar | 602.8 | Aug 2026 | Approved to connect |
| Sbranch SolarTap 138kV 44190 East Bernard - 44130 Caney | Bernard Creek Solar, LLC | Solar | 233.5 | Oct 2026 | Approved to connect |
| Lane City Wind44040 Bailey 345kV | RWE Clean Energy, LLC | Wind | 199.5 | Dec 2026 | Approved to connect |
| Hollywood Solar Repower44060 BLU 345kV | RED TAILED HAWK SOLAR LLC | Solar | 9.9 | Sep 2026 | Signed; security posted |
| East Bernard BESSStation Name: East Bernard | Regis East Bernard LLC | Battery storage (stand-alone) | 9.5 | Nov 2026 | Signed; security posted |
| Raven StorageTap 138kV 44740 Wallis - 44190 East Bernard CKT#65 | Raven Storage, LLC | Battery storage (stand-alone) | 103.5 | Feb 2027 | Signed; security posted |
| Space City Solar44200 Hillje 345kV | Apollo Solar Ranch, LLC | Solar | 366.0 | Jun 2027 | Signed; security posted |
| OCI SunRopertap138kV #43190 South Lane City to #42985 Dyann CKT#60 | OCI SunRoper LLC | Solar | 265.1 | Oct 2027 | Signed; security posted |
| Diran BESS43190 South Lane City 138kV | BRP Diran BESS LLC | Battery storage (stand-alone) | 103.0 | Jan 2028 | Signed; security posted |
| Northington SolarThe 138 kV El Campo (#8102) - Pulsar (#8192) Line; AEP. | Northington Solar, LLC | Solar | 125.9 | Mar 2028 | Signed; security posted |
| Ramsey Storage44200 Hillje 345kV | Hecate Energy Ramsey Storage LLC | Battery storage (stand-alone) | 500.0 | Jun 2028 | Signed; security posted |
| Maleza Solartap Blue – Hillje 345 kv Ckt.#27 | Brush Solar LLC | Solar | 254.9 | Dec 2028 | Signed; security posted |
| PHOTON SOLAR REPOWERING44880 Waterh_POI_5 345kV | GulfStar Power, LLC | Solar | Self-limiting | Aug 2027 | Signed Feb 2021 |
| Cernan BESSHillje 345kV (#44200) | Cernan BESS LLC | Battery storage (stand-alone) | 10.0 | Oct 2027 | Signed Dec 2025 |
| Sorghum BESS#44060 Blue Substation 345kV | Blue Creek BESS, LLC | Battery storage (stand-alone) | 208.9 | Dec 2027 | Signed Jan 2025 |
| EmberGreenTap 138kV 48050 Caney - 44150 Hungerford | EmberGreen Energy Center | Gas turbine | 1,036.0 | Jan 2028 | Signed Aug 2026 |
| TOCE BESS 1138 kV Danevang Switching Station (Bus# 5546) | TOCE BESS 1, LLC | Battery storage (stand-alone) | 205.2 | May 2028 | Signed Dec 2024 |
| Erin Solar44040 Bailey 345 kV | Erin Solar LLC | Solar | 208.3 | Dec 2029 | Signed Mar 2023 |
| Malachite BESSTap 345 kV 44200 Hillje – 9073 Holman | Malachite Storage LLC | Battery storage (paired with solar) | 191.1 | Apr 2032 | Signed Dec 2025 |
| Malachite SolarThe 345 kV Hillje (#44200) – Holman (#9073) Line; AEN. | Malachite Solar LLC | Solar | 184.6 | Apr 2032 | Signed Dec 2025 |
| Cottonseed Energy StorageSouth Lane City and PSEE # is 43190 | Cottonseed Energy Storage LLC | Battery storage (stand-alone) | 207.6 | Apr 2027 | In study |
| PHOTON BESS REPOWERING44880 Waterh_POI_5 345kV | GulfStar Power, LLC | Battery storage (paired with solar) | 305.5 | Aug 2027 | In study |
| Hynes Bay Energy StorageTap 138kV 5546 DANEVANG SW - 8121 BLESSING | Hynes Bay Energy Storage, LLC | Battery storage (stand-alone) | 101.2 | Dec 2027 | In study |
| Voyager Storage44200 Hillje 345kV | EDF Renewables Development, Inc. | Battery storage (stand-alone) | 50.1 | Apr 2028 | In study |
| Alpujarra Solar5521 GALOW 138 KV | Greening USA Corp. | Solar | 112.5 | May 2028 | In study |
| Brela BESS LLC44040 Bailey SW 345 kV | Brela BESS LLC | Battery storage (stand-alone) | 251.3 | May 2028 | In study |
| Wittig Solar138 kV Gulftie (#43340) – San Bernard (#43110) | Greenalia Solar Power Wittig LLC | Solar | 106.9 | Oct 2028 | In study |
| Boling Generation (TEF-Due Diligience)43340 Gulftie 138kV | Boling Generation | Gas turbine | 400.0 | Dec 2028 | In study |
| Blue Creek Energy StorageTap 138kV 42985 DYANN_POI8 - 43190 S_LANE_B138 Ckt 60 | Blue Creek Energy Storage, LLC | Battery storage (stand-alone) | 101.2 | Dec 2028 | In study |
| Hadrian Energy StorageLine Tap 138kV #43012 NEWGLF60T3_8 - #43190 S_LANE_B138 | Hadrian Energy Storage, LLC | Battery storage (stand-alone) | 101.2 | Dec 2028 | In study |
| Maleza Solar IItap Blue – Hillje 345 kv Ckt.#27 | Brush Solar, LLC | Solar | 254.9 | Dec 2028 | In study |
| Maleza Storagetap Blue – Hillje 345 kv Ckt.#27 | Brush Storage, LLC | Battery storage (paired with solar) | 150.8 | Dec 2028 | In study |
| Maleza Storage II44220 Julia 345kV | Brush Storage, LLC | Battery storage (stand-alone) | 256.1 | Dec 2028 | In study |
| Neal Batterytap of 138kV 8750 CHARMERP4A - 8127 South Lane City | CH Neal Battery LLC | Battery storage (paired with solar) | 120.5 | Apr 2029 | In study |
| Neal Solartap of 138kV 8750 CHARMERP4A - 8127 South Lane City | CH Neal Solar LLC | Solar | 146.6 | Apr 2029 | In study |
| Peach Creek Solar44040 Bailey 345 kV | AEUG Peach Creek Solar LLC | Solar | 300.0 | Sep 2029 | In study |
| Zora Solar46650 Athena 138 kV | Zora Solar, LLC | Solar | 250.8 | Oct 2029 | In study |
Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.
Where are the flood maps for Wharton County?
FEMA flood maps for Wharton County
How does a project here connect to the grid?
Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.
Interconnection by market and utilityERCOT resource integration
What state and federal reviews can apply?
Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.
Statewide and federal contactsTexas decommissioning law
Check a specific property in Wharton County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 12
Austin · Brazoria · Chambers · Colorado · Fort Bend · Galveston · Harris · Liberty · Matagorda · Montgomery · Walker · Waller