Matagorda County, Texas: solar, wind, and storage permits

Contacts checked 2026-09-26 · From official state and federal directories

Who to call and what to check for a solar, wind, or battery storage project in Matagorda County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Matagorda County?

The Matagorda County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Matagorda County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Matagorda County?

TCEQ Region 12, Houston
5425 Polk St, Ste H, Houston TX 77023-1452
Main line: 713-767-3500 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Matagorda County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Matagorda County?

ERCOT's August 2026 interconnection report lists 28 proposed energy projects in Matagorda County (12 solar, 1 wind, 14 battery storage and 1 nuclear), about 6,355 MW in all. 10 of the 28 have a signed interconnection agreement, and 1 has been energized or approved to connect.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
Peyton Creek Wind II42400 Refuge 345kVRWE Renewables Development, LLCWind241.2Dec 2026Approved to connect
Pavlov BESS2New DESR on the coordinates above tie at 12.47kV to: TSP Station Na...Matagorda Clean Energy Center, LLCBattery storage (stand-alone)10.0Aug 2026Signed; security posted
Pledger BESS29.188382, -95.911558Regis Pledger LLCBattery storage (stand-alone)9.5Nov 2026Signed; security posted
Duffy BESSTap 345kV WAP to STP CKT39 (PTI# 5915-44000 CKT 39)Duffy Energy Storage LLCBattery storage (paired with solar)241.1Dec 2026Signed; security posted
City Breeze BESS8111 MAGILL4A 138KVCity Breeze BESS LLCBattery storage (stand-alone)143.1Mar 2027Signed; security posted
Isaac Solar8114 Conoco 138kVIndustrial Bravo Project LLCSolar50.7Apr 2027Signed; security posted
Matagorda Solar5555 Shropshire 69kVMatagorda Solar Farm, LLCSolar101.0Aug 2027Signed; security posted
Duffy SolarTap 345kV WAP to STP CKT39 (PTI# 5915-44000 CKT 39)Duffy Project Co LLCSolar502.5Dec 2027Signed; security posted
Eldora BESS345 kV South Texas Project (Bus# 5915) – Hillje (Bus# 44200) Transm...Eldora Energy LLCBattery storage (paired with solar)201.3Jul 2028Signed; security posted
Eldora SolarTap 345 kV 5915 South Texas Project – 44200 Hillje Ckt 1Eldora Energy LLCSolar200.9Jul 2028Signed; security posted
Charolais Solartap 345kV 44000 W A Parish - 5915 STPRWE Solar Development, LLCSolar261.6Dec 2026In study
Charolais Storagetap 345kV 44000 W A Parish - 5915 STPRWE Solar Development, LLCBattery storage (paired with solar)150.0Dec 2026In study
STP Unit2 High Pressure Turbine Upgrade5915 SO_TEX__345A 345 kVConstellation South Texas, LLCNuclear1,336.5Apr 2027In study
Razorbill Solartap 345kV 5915 STP to 44200 Hillje 345kV Ckt 64RWE Solar Development, LLCSolar240.0Dec 2027In study
Razorbill Storagetap 345kV 5915 STP to 44200 Hillje 345kV Ckt 64RWE Solar Development, LLCBattery storage (paired with solar)120.0Dec 2027In study
Blackcat Storage138kV Blackcat Substation (#80124)Matagorda ESS, LLCBattery storage (stand-alone)200.6Dec 2027In study
Pledgor BESSTap Gulftie (43340) – Pledger (43120) circuit 60Pledgor BESSBattery storage (stand-alone)100.3Apr 2028In study
Shoshana StorageTap STP – Refuge ckt 27Shoshana Storage Project LLCBattery storage (stand-alone)221.0May 2028In study
Midfield BESS Project SLFTap 138kV 8121 Blessing - 8125 LolitaHQC Solar Holdings 1, LLCBattery storage (paired with solar)Self-limitingJul 2028In study
Midfield PV Project SLFTap 138kV 8121 Blessing - 8125 LolitaHQC Solar Holdings 1, LLCSolar150.0Jul 2028In study
Post Trail EnergyTap 138kV Conoco 8138 - Black Cat 80124Post Trail Energy, LLCBattery storage (stand-alone)103.5Oct 2028In study
Running Iron SolarTap 138kV Conoco 8138 - Black Cat 80124Running Iron Solar, LLCSolar204.7Oct 2028In study
Bastion BESSBlessing Substation 138 kV (ID 8121)BESS BASTION LLCBattery storage (stand-alone)154.3Nov 2028In study
Solar Star Bay City StorageTap 138kV Conoco (#8138) – Black Cat (#80124)Solar Star Bay City StorageBattery storage (stand-alone)206.3Feb 2029In study
Bluefox Solar 1#8754 Zoisite 345kVIndustrial November Project LLCSolar402.6May 2029In study
Percy Farm SolarTap 345kV 8123 Blessing - 5915 STPPercy Farm Solar 1, LLCSolar198.6May 2029In study
Bluefox Solar 2#8754 Zoisite 345kVIndustrial November Project LLCSolar401.8Jan 2030In study
Bluefox Solar 3#8754 Zoisite 345kVIndustrial November Project LLCSolar201.8Apr 2030In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Matagorda County?

FEMA flood maps for Matagorda County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Matagorda County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 12

Austin · Brazoria · Chambers · Colorado · Fort Bend · Galveston · Harris · Liberty · Montgomery · Walker · Waller · Wharton

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.