Harris County, Texas: solar, wind, and storage permits
Who to call and what to check for a solar, wind, or battery storage project in Harris County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.
Who handles property records and taxes in Harris County?
The Harris County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.
Harris County directory (Texas Comptroller)Lease rates and rollback taxes
Which TCEQ office covers Harris County?
TCEQ Region 12, Houston
5425 Polk St, Ste H, Houston TX 77023-1452
Main line: 713-767-3500 · Spills, 24 hours: 800-832-8224
Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.
TCEQ region directoryConstruction stormwater permit
Does Harris County have zoning or a solar permit?
Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.
What energy projects are proposed in Harris County?
ERCOT's August 2026 interconnection report lists 31 proposed energy projects in Harris County (1 solar, 26 battery storage, 3 gas and 1 other), about 6,732 MW in all. 11 of the 31 have a signed interconnection agreement, and 2 have been energized or approved to connect.
Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.
Scroll the table sideways to see every column.
| Project and connection point | Developer | Type | MW | Projected in service | Stage |
|---|---|---|---|---|---|
| Little York BESSStation Name (TDSP Station Code): Little York (LK) | ESTX-PLD-HOUSTON5, LLC | Battery storage (stand-alone) | 10.0 | Jul 2026 | Approved to connect |
| Kegans BESS (Houston IV BESS)44140 CLODINE 138kV | SMT Houston IV LLC | Battery storage (stand-alone) | 164.6 | Sep 2026 | Approved to connect |
| Beacon Storage40450 Deepwater 345kV | AES Distributed Energy, Inc | Battery storage (stand-alone) | 408.7 | Oct 2029 | Under construction |
| Sigma Storage40460 Deepwater 138kV | AES Distributed Energy, Inc | Battery storage (stand-alone) | 408.4 | Oct 2029 | Under construction |
| Enchanted Rock NEWPP40475 Deusen 138kV | Generate ER-NG, LLC | Gas engines | 30.0 | Feb 2026 | Signed; security posted |
| Callisto II Energy Center47150 HO Clarke 138kV | Callisto II Energy Center LLC | Battery storage (stand-alone) | 203.2 | Oct 2026 | Signed; security posted |
| Pamela Heights I#47150 HOC 138kV | Pamela heights I Energy Center LLC | Battery storage (stand-alone) | 101.7 | Dec 2026 | Signed; security posted |
| NRG Greens Bayou 6 (TEF-Due Diligence)Position 1/0 PSSE 40710, Greens Bayou Substation, 138 kV | NRG Greens Bayou 6 LLC | Gas turbine | 445.0 | May 2028 | Signed; security posted |
| Dori BQ BESS138kV line Holmes (#47210) - Garden Villas (#42680); CNP | Sunnyside Energy LLC | Battery storage (paired with solar) | 154.0 | Aug 2027 | Signed May 2023 |
| Dori BQ Solartap 138kV 47210 Holmes – 42680 Garden Villas | Sunnyside Energy, LLC | Solar | 50.4 | Aug 2027 | Signed Dec 2022 |
| Pez Rojo BESSTap 138 kV #40260 Chamon - #40912 King | Pez Rojo BESS, LLC | Battery storage (stand-alone) | 217.2 | Feb 2029 | Signed May 2026 |
| SANJAC BESS40270 Riverside 138kV | Castleman Power | Battery storage (stand-alone) | 202.4 | Apr 2027 | In study |
| NET Power Demonstration plant42360 Mirage POI 8 138kV | NET Power LLC | Gas turbine | 25.5 | Aug 2027 | In study |
| Rex StorageTap 138 kV 48096 El Dorado - 43610 Scarsdale CKT 92 | Rex BESS, LLC | Battery storage (stand-alone) | 256.4 | Sep 2027 | In study |
| Hobby BESS IDouble Tap 138kV 42680 Garden Villas – 48250 Hall & 42680 Garden Vi... | Airport Storage II LLC | Battery storage (stand-alone) | 602.6 | Oct 2027 | In study |
| Knight Airport BESS ITap 138kV 48126 Gulfgate - 48199 Knight 06 and 42680 Garden Villas... | Airport Storage I LLC | Battery storage (stand-alone) | 522.5 | Oct 2027 | In study |
| Bluegill BESSTap 138 kV 40130 Atascocita - 40690 East Gate | Bluegill BESS, LLC | Battery storage (stand-alone) | 251.0 | Oct 2027 | In study |
| Outer Loop BESS40700 Greens Bayou 345kV | Black Mountain Energy Storage II | Battery storage (stand-alone) | 201.2 | Dec 2027 | In study |
| Claire BESS40011 Cedar Bayou 138kV | BRP Blue Topaz 3, LLC | Battery storage (stand-alone) | 406.0 | Dec 2027 | In study |
| Houston BESSTap 138 kV LAUDER (#46002) - RITTENHOUSE (#46282) ckt 95 | SMT Houston | Battery storage (stand-alone) | 227.9 | Jan 2028 | In study |
| Massey StorageTap 138kV Chevron_NewSub(#99300) and Cedar Bayou Tap(#48065) circu... | Massey Storage, LLC | Battery storage (stand-alone) | 102.9 | Jan 2028 | In study |
| Stinger Energy StorageTap Atascocita 138kV Substation (Bus # 40130) - Lake Houston (Bus #... | Stinger Energy Storage LLC | Battery storage (stand-alone) | 200.8 | Mar 2028 | In study |
| High Plains Storage45880 Hockley 138kV | ROBP Holdings, LLC | Battery storage (stand-alone) | 157.7 | May 2028 | In study |
| Callisto ID Energy Center47150 (H_O_C__B138) 138kV | Tempus Power management LLC | Battery storage (stand-alone) | 100.0 | Jun 2028 | In study |
| Barcelona TxHSR TPSS HN-4tap 138kV 45885 HocklyC - 46220 Peters | Texas Central Rail Holdings, LLC | Other | 50.0 | Jul 2028 | In study |
| Furay Battery Energy Storage SystemTap 138kV 45660 Jonte substation – 46332 Scenic Woods | Blue Topaz 1, LLC | Battery storage (stand-alone) | 304.0 | Sep 2028 | In study |
| Texas Deepwater BESS#40881 Parkes Substation 138 kV | TDWP Partners LLC | Battery storage (stand-alone) | 313.3 | Mar 2029 | In study |
| Burnet Bay Storagetap 138kV 40390 Crosby - 40790 Haney | TOCE TX BESS 4, LLC | Battery storage (stand-alone) | 207.8 | Jun 2029 | In study |
| Coati Energy StorageBus # 40830, Humble, 138 kV | PowerPulse LLC | Battery storage (stand-alone) | 202.8 | Jun 2029 | In study |
| Pinnacle Point Energy StorageTap Highlands (Bus # 40812) - HANEY ( BUS # 40790) 138 kV | GCI Pinnacle Point, LLC | Battery storage (stand-alone) | 101.3 | Jul 2029 | In study |
| Hyacinth Storage46500 Tomball 345 kV | Hyacinth Storage, LLC | Battery storage (stand-alone) | 103.0 | Dec 2030 | In study |
Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.
Where are the flood maps for Harris County?
FEMA flood maps for Harris County
How does a project here connect to the grid?
Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.
Interconnection by market and utilityERCOT resource integration
What state and federal reviews can apply?
Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.
Statewide and federal contactsTexas decommissioning law
Check a specific property in Harris County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.