Quicksand Check

Home › Texas permits › Fort Bend County

Fort Bend County, Texas: solar, wind, and storage permits

Contacts checked 2026-09-26 · From official state and federal directories

Who to call and what to check for a solar, wind, or battery storage project in Fort Bend County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Fort Bend County?

The Fort Bend County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Fort Bend County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Fort Bend County?

TCEQ Region 12, Houston
5425 Polk St, Ste H, Houston TX 77023-1452
Main line: 713-767-3500 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Fort Bend County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Fort Bend County?

ERCOT's August 2026 interconnection report lists 11 proposed energy projects in Fort Bend County (11 battery storage), about 2,008 MW in all. 5 of the 11 have a signed interconnection agreement, and 3 have been energized or approved to connect.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
IEP Orchard BESSStation Name (TDSP Station Code): ORIEP Tejas Verde LLCBattery storage (stand-alone)10.0Sep 2026Approved to connect
Crowned Heron BESSWA Parish 345 kV Bus #44000RWE RenewablesBattery storage (stand-alone)154.2Oct 2026Approved to connect
Crowned Heron BESS 2WA Parish 345 kV Bus #44000RWE RenewablesBattery storage (stand-alone)154.2Oct 2026Approved to connect
Rock Rose BESS44070 Whaley 345 kVRock Rose Energy Storage LLCBattery storage (stand-alone)208.5Mar 2027Signed; security posted
Avalon BESSTapping the 345 kV Line from Smithers (Bus# 44650) to Bellaire (Bus...Avalon BESS, LLCBattery storage (stand-alone)522.1Dec 2026Signed Dec 2024
Elan BESS42380 Needville 138kVElan BESS, LLCBattery storage (stand-alone)202.7Dec 2026In study
UNICORN BESSTap 138 kV Wa Parish (#44015) - Crabb River Road Line (#44170) Line...Unicorn EnergiesBattery storage (stand-alone)279.0Sep 2027In study
Bypass BESS II44000 Wa Parish 345 kVBypass BESS II LLCBattery storage (stand-alone)205.9Apr 2028In study
Pato Blanco StorageTap 138 kV 44010 W A Parish - 42980 NASH___S02_8TX BESS 4, LLCBattery storage (stand-alone)71.3Dec 2028In study
Redbird BESS44090 Cedar Creek 345kVRedbird BESS, LLCBattery storage (stand-alone)100.0Mar 2029In study
Elysium Energy Center BESS44030 Arcola 138 kVAdapture Solar DevelopmentBattery storage (stand-alone)100.0Jan 2030In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Fort Bend County?

FEMA flood maps for Fort Bend County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Fort Bend County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 12

Austin · Brazoria · Chambers · Colorado · Galveston · Harris · Liberty · Matagorda · Montgomery · Walker · Waller · Wharton

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.