Home › Texas permits › Colorado County
Colorado County, Texas: solar, wind, and storage permits
Who to call and what to check for a solar, wind, or battery storage project in Colorado County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.
Who handles property records and taxes in Colorado County?
The Colorado County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.
Colorado County directory (Texas Comptroller)Lease rates and rollback taxes
Which TCEQ office covers Colorado County?
TCEQ Region 12, Houston
5425 Polk St, Ste H, Houston TX 77023-1452
Main line: 713-767-3500 · Spills, 24 hours: 800-832-8224
Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.
TCEQ region directoryConstruction stormwater permit
Does Colorado County have zoning or a solar permit?
Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.
What energy projects are proposed in Colorado County?
ERCOT's August 2026 interconnection report lists 16 proposed energy projects in Colorado County (4 solar, 11 battery storage and 1 gas), about 2,043 MW in all. 4 of the 16 have a signed interconnection agreement.
Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.
Scroll the table sideways to see every column.
| Project and connection point | Developer | Type | MW | Projected in service | Stage |
|---|---|---|---|---|---|
| Stafford Hill BESSNew DESR on the coordinates above tie at 12.47kV to: TSP Station Na... | Colorado Clean Energy Center, LLC | Battery storage (stand-alone) | 9.9 | Nov 2026 | Signed; security posted |
| Kleimann BESSNew DESR on the coordinates above tie at 12.47kV to: TSP Station Na... | Columbus Clean Energy Center, LLC | Battery storage (stand-alone) | 9.9 | Nov 2026 | Signed; security posted |
| Rock Island Generating (TEF -Due Diligence)57640 Rock Island 138 kV | Kerrville Public Utility Board Public Facility Corporation | Gas engines | 121.8 | Jun 2027 | Signed; security posted |
| Driet BESS7254 WEIMAR8 138kV | Driet BESS LLC | Battery storage (stand-alone) | 150.5 | Jun 2028 | Signed Dec 2025 |
| Pearl Crescent SolarRock Island (57640) 138kV | RWE Solar Development, LLC | Solar | 208.3 | Dec 2026 | In study |
| Pearl Crescent StorageRock Island (57640) 138kV | RWE Solar Development, LLC | Battery storage (paired with solar) | 50.3 | Dec 2026 | In study |
| Cottontail Energy Center7258 Glidden Substation 138kV | Cottontail Energy Center, LLC | Battery storage (stand-alone) | 200.8 | Oct 2027 | In study |
| Paloma Energy CenterTap 138 kV 57640 Rock Island - 57639 Sheridan | Harrison Street Development, LLC | Solar | 193.8 | Dec 2027 | In study |
| Paloma Energy Center BESSTap 138kV 57640 Rock Island - 57639 Sheridan | Harrison Street Development, LLC | Battery storage (paired with solar) | 53.6 | Dec 2027 | In study |
| Moonlight Sonata BESSAltair (78118) – Nada (78103) 138KV | Samsung Solar Energy 2, LLC | Battery storage (stand-alone) | 201.1 | Jul 2028 | In study |
| Firefly Fields SolarTap 138 kV <57640> <Rock Island> - <7258> <Glidden> | Firefly Fields Energy Center LLC | Solar | 100.5 | Sep 2028 | In study |
| Firefly Fields StorageTap 138 kV 57640 Rock Island to 7258 Glidden | Firefly Fields Energy Center LLC | Battery storage (paired with solar) | 156.5 | Sep 2028 | In study |
| Radiant Plains Energy Center SolarTap 138-kV Weimar (7254) to Schulenburg (7252) | Adapture Solar Development | Solar | 100.0 | Dec 2029 | In study |
| Radiant Plains Energy Center BESSTap 138-kV Weimar (7254) to Schulenburg (7252) | Adapture Solar Development | Battery storage (paired with solar) | 100.0 | Dec 2029 | In study |
| Altair Energy StorageTap on 138 kV ALTAIR (bus# 78118) to STAFFORD HILL (bus# 78520) | Altair Energy Storage | Battery storage (stand-alone) | 201.8 | Mar 2030 | In study |
| Montezuma StorageL_GLIDDE8_1Y; Bus number - 7258 138KV | Montezuma Storage LLC | Battery storage (stand-alone) | 183.9 | Oct 2030 | In study |
Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.
Where are the flood maps for Colorado County?
FEMA flood maps for Colorado County
How does a project here connect to the grid?
Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.
Interconnection by market and utilityERCOT resource integration
What state and federal reviews can apply?
Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.
Statewide and federal contactsTexas decommissioning law
Check a specific property in Colorado County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.