Who to call and what to check for a solar, wind, or battery storage project in Galveston County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Galveston County?

The Galveston County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Galveston County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Galveston County?

TCEQ Region 12, Houston
5425 Polk St, Ste H, Houston TX 77023-1452
Main line: 713-767-3500 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Galveston County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Galveston County?

ERCOT's August 2026 interconnection report lists 11 proposed energy projects in Galveston County (1 wind, 9 battery storage and 1 gas), about 2,943 MW in all. 6 of the 11 have a signed interconnection agreement, and 2 have been energized or approved to connect.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
Air Products GCA39140 TNTxCityMain 69kV (Will be upgraded to 138kV)Air ProductsGas steam turbine14.0Dec 2025Approved to connect
VERTUS ENERGY STORAGEBus Name: TnMainland1,VERTUS ENERGY STORAGE LLCBattery storage (stand-alone)207.3Jul 2026Approved to connect
SOUTHERN SELECT ENERGY STORAGEBus Name: TNHEIGHTS_1SOUTHERN SELECT ENERGY STORAGE LLCBattery storage (stand-alone)204.8May 2027Signed; security posted
Red Egret BESS38820 FREEWAY PARK 138KVRed Egret LLCBattery storage (stand-alone)310.6Nov 2027Signed; security posted
Zeya BESS38740 Heights 138kVBRP Zeya BESS LLCBattery storage (stand-alone)255.3Dec 2027Signed; security posted
Shepard Energy Storage# 38900 Hidden Lakes - # 42015 PHR 138 KVShepard Energy Storage LLCBattery storage (stand-alone)256.8Jun 2028Signed; security posted
IEP Blackhawk38740 Heights Substation 138kVIEP Texas Verde II, llcBattery storage (stand-alone)100.0Dec 2026In study
Hacienda Storage38745 Attwater 138kVGalveston Energy Storage LLCBattery storage (stand-alone)205.8Dec 2027In study
Vertus Energy Storage 238830 TNMAINLAND1 138 KVVertus Energy Storage 2 LLCBattery storage (stand-alone)204.9Feb 2028In study
Valcrest BESStap 138 kV 43500 WEBSTR_B138A - 48403 W_GALV01TP_8Flexen USA LLCBattery storage (stand-alone)154.2Dec 2028In study
Hecate Energy Jamaica Wind42000 P. H. Robinson 345kVHecate Energy LLCWind1,029.4Jun 2030In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Galveston County?

FEMA flood maps for Galveston County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Galveston County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 12

Austin · Brazoria · Chambers · Colorado · Fort Bend · Harris · Liberty · Matagorda · Montgomery · Walker · Waller · Wharton

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.