Quicksand Check

Home › Texas permits › Brazoria County

Brazoria County, Texas: solar, wind, and storage permits

Contacts checked 2026-09-26 · From official state and federal directories

Who to call and what to check for a solar, wind, or battery storage project in Brazoria County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Brazoria County?

The Brazoria County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Brazoria County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Brazoria County?

TCEQ Region 12, Houston
5425 Polk St, Ste H, Houston TX 77023-1452
Main line: 713-767-3500 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Brazoria County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Brazoria County?

ERCOT's August 2026 interconnection report lists 57 proposed energy projects in Brazoria County (14 solar, 2 wind, 38 battery storage and 3 gas), about 11,697 MW in all. 32 of the 57 have a signed interconnection agreement, and 6 have been energized or approved to connect.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
DAMON BESS3Station Name: DAMONBarBar Storage LLCBattery storage (stand-alone)10.0Dec 2025Approved to connect
DAMAZO (Second Division) SOLARTap 138 kV SANBER_POI_8 (Bus# 43110) to WEST COLUMBIA (Bus# 43380)...TX Gulf Solar 1 LLCSolar100.2Dec 2025Approved to connect
Cottonwood Bayou Solartap 138kV 42870 Liverpool - 43070 PetsonCottonwood Bayou Solar, LLCSolar351.4Aug 2026Approved to connect
Bocanova Power II39030 TNMP Alvin 138kVBocanova Power II LLCBattery storage (stand-alone)150.5Aug 2026Approved to connect
Tanglewood Solar345kV Seabreeze SubstationBrazoria Solar, LLCSolar251.0Sep 2026Approved to connect
Myrtle Solar42110 Angleton 138kVMyrtle Solar, LLCSolar321.2Jun 2027Approved to connect
Austin Bayou SolarTap 345 kV Savana 43180 to Seabreeze 43020 - Ckt 27Austin Bayou Solar, LLCSolar502.5Jun 2027Signed; security posted
Damon BESS 29.99 MW 50 MWh battery energy storage project connecting at 12.47kV...PR DAMON, LLCBattery storage (stand-alone)10.0Aug 2027Signed; security posted
Cradle Solartap 345kV 42500 Dow - 43035 Oasis ckt 18Cradle Solar LLCSolar200.8Sep 2027Signed; security posted
First Capitol BESSTap 138kV West Columbia Main (39500) - Sweeny Cogen (110505)First Capitol BESS, LLCBattery storage (stand-alone)257.5Nov 2027Signed; security posted
Cascade Solar43180 SAVANAH 345 kVCascade Solar Energy, LLCSolar171.0Jan 2028Signed; security posted
Skipjack Energy StorageTap 138 42980 Nash - 44010 W A Parish ckt #2Skipper Energy Storage LLCBattery storage (stand-alone)150.6Feb 2028Signed; security posted
Aldrin 138 BESS(Bus: 39015) North Alvin TNMP 138kVAldrin Energy Storage LLCBattery storage (stand-alone)207.0Mar 2028Signed; security posted
Aldrin 345 BESS(Bus: 43030) Meadow 345kV substationAldrin Energy Storage LLCBattery storage (stand-alone)362.0Mar 2028Signed; security posted
Royal River BESSTap 138kV 42110 Angleton - 43381 West ColumbiaRoyal River LLCBattery storage (stand-alone)310.7Jun 2028Signed; security posted
Elio BESSTap 138kV 42980 Nash - 44010 Wa Parish circuit 02Elio Energy LLCBattery storage (stand-alone)317.2Aug 2028Signed; security posted
Liatris Flexible GasTap 138 kV (42980) Nash - (44010) WA Parish CKT02Stone Creek Peaker LLCGas turbine204.7Feb 2029Signed; security posted
Byrd Ranch Repower39700 SWEENY 138kVByrd Ranch Storage LLCBattery storage (stand-alone)5.5Jan 2027Signed Dec 2020
Austin Bayou Storage ITap 345 kV Savana 43180 to Seabreeze 43020 - Ckt 27Austin Bayou Solar, LLCBattery storage (paired with solar)150.7Jun 2027Signed Feb 2025
Austin Bayou Storage IITap to CKT#27 from Savana (Bus# 43180) to Oasis (Bus# 43035) – 345...Austin Bayou Solar, LLCBattery storage (paired with solar)156.6Jun 2027Signed Feb 2025
Austin Bayou Storage IIITap 345 kV Savana 43180 to Seabreeze 43020 - Ckt 27Austin Bayou Solar, LLCBattery storage (paired with solar)156.6Jun 2027Signed Feb 2025
Hastings Park BESS39010 138kV HASTINGSBrazos Roots BESS, LLCBattery storage (stand-alone)256.3Sep 2027Signed Aug 2025
Dan Kearney BESS39703 TNFM524 138kVDan Kearney BESS LLCBattery storage (stand-alone)204.4Oct 2027Signed Oct 2024
Willow Beach WindTap 138 kV Bus# 42100 HUD_8 – Bus# 42960 MUSTNG_S04_8 138kV CKT# 4Capital Wind, LLCWind202.3Oct 2027Signed Jun 2025
Bell Creek BESSTap 138kV 39500 West Colombia - 39703 FM524BELL CREEK BESS, LLCBattery storage (stand-alone)200.9Oct 2027Signed Nov 2024
Brazos River BESSTap 138kV 39530 West Colombia LOCAL TNP - 39560 ANGLETON TNPBrazos River BESS LLCBattery storage (stand-alone)180.4Oct 2027Signed May 2025
Long Point Storage138 KV (CEHE Sub) Tap Burke (42410) - Eagle Nest (42430) ckt 02Long Point Storage, LLCBattery storage (paired with solar)100.6Dec 2027Signed Aug 2023
GAMAY ENERGY STORAGETap 138 kV Line from TNFM524 (39703) to West Columbia Main (39500),...GAMAY ENERGY STORAGE LLCBattery storage (stand-alone)418.6Jan 2028Signed May 2025
Pinewood Solar43020 Seabreeze 345kVBrazoria Solar II, LLCSolar150.7Feb 2028Signed May 2025
Clutch City Solar Phase Itap 138kV 42960 Mustang Bayou – 42100 Hudson CKT #04HZ Solar I, LLCSolar200.8Jul 2028Signed Sep 2022
Clutch City Solar Phase IItap 138kV 42960 Mustang Bayou – 42100 Hudson CKT#04HZ SOLAR I, LLCSolar251.3Jul 2028Signed Feb 2025
Margay Energy StorageTap 138kV 42750 Mykawa - 48353 Telephone Ckt 06PowerPulse LLCBattery storage (stand-alone)101.3Apr 2029Signed Dec 2025
Second Division StorageTap 138 kV SANBER_POI_8 (Bus# 43110) to WEST COLUMBIA (Bus# 43380)...Mound Creek Storage, LLCBattery storage (stand-alone)Self-limitingDec 2025In study
Stargazer BESS44010 WA Parish - 42980 Nash 138 kV ckt 02Stargazer Solar LLCBattery storage (paired with solar)104.5Feb 2027In study
Stargazer Solar44010 WA Parish - 42980 Nash 138 kV Ckt 02Stargazer Solar LLCSolar157.7Feb 2027In study
Rock N' Roll Solar SLFtap 138kV 44600 Rosharon - 44531 WinmilRock N’ Roll Solar, LLCSolar152.0Aug 2027In study
Rock N' Roll Storage Twotap 138kV 44600 Rosharon - 44531 WinmilRock N’ Roll Solar, LLCBattery storage (paired with solar)206.0Aug 2027In study
Marcus Energy StorageTap 138kV 39500 West Columbia Main - 110505 Sweeny Co-Gen LP Ckt 1Marcus Energy Storage, LLCBattery storage (stand-alone)201.0Sep 2027In study
Pequin Energy Storage39500 TN West Columbia 138kVPequin Energy Storage, LLCBattery storage (stand-alone)103.4Sep 2027In study
Friendswood Energy StorageTAP 138kV 39010 HASTINGS - 38980 FRIENDSWOODFriendswood Energy Storage LLCBattery storage (stand-alone)105.1Sep 2027In study
Goby Energy CenterTap 138kV line 44390 Karsten - 44721 ThompsonsGoby Energy CenterBattery storage (stand-alone)200.7Sep 2027In study
Cobra Clean Energy Centerlooped on circuit 04 between Mustang Bayou (#42960) and Hudson (#42...Cobra Clean Energy Center LLCBattery storage (stand-alone)100.4Oct 2027In study
Bulldog Power (TEF - Due Diligence)39703 TNMP FM524 Substation 138kVBulldog Power LLCGas turbine311.0Dec 2027In study
Copano Bay Energy StorageTap 138kV 42980 Nash - 44010 WA Parish Ckt 2Copano Bay Energy Storage, LLCBattery storage (stand-alone)201.0Dec 2027In study
Rubicon Power BESS39703 TNMP FM524 138kVRubicon Power LLCBattery storage (stand-alone)301.4Dec 2027In study
Cascade Storage345kV Oasis (43035) – Seabreeze circuit 27Oyster Creek LLCBattery storage (paired with solar)250.0Jun 2028In study
Rosharon BESS138 kV 42570 Archer (ACH)Rosharon BESS LLCBattery storage (stand-alone)120.0Jun 2028In study
Rock N' Roll Storage SLFtap 138kV 44600 Rosharon - 44531 WinmilRock N’ Roll Solar, LLCBattery storage (paired with solar)Self-limitingAug 2028In study
Gulf Prairie BESS(CEHESub) looped either 1) on 138 kV circuit 82 between RIWOOD (#43...Gulf Prairie Energy LLCBattery storage (paired with solar)207.8Dec 2028In study
Gulf Prairie Solar(CEHESub) looped either 1) on 138 kV circuit 82 between RIWOOD (#43...Gulf Prairie Energy LLCSolar202.2Dec 2028In study
Southside EnergyTap 138kV 42960 Mustang Bayou - 42100 HUDSON ckt 4Southside Energy, LLCBattery storage (stand-alone)101.2Dec 2028In study
Surfside Energy StorageTap 138kV 42110 Angleton – 43150 Riwood ckt 82Rocky Mountain Energy Holdings, LLCBattery storage (stand-alone)50.3Dec 2028In study
Oyster Creek Solar I SLFTap 138kV 42110 Angleton - 42050 CluteOyster Creek Solar 1, LLCSolarSelf-limitingApr 2029In study
Oyster Creek Storage I SLFTap 138kV 42110 Angleton - 42050 CluteOyster Creek Solar 1, LLCBattery storage (paired with solar)Self-limitingApr 2029In study
Palisade BESSHoffman (42810) - Lake Jackson (42880) 138 kV lineFlexen USA LLCBattery storage (stand-alone)153.5Oct 2029In study
Hecate Energy Orem Wind42530 Jones Creek 345kVHecate Energy LLCWind1,542.0Jun 2030In study
Bulldog Power II39703 TNMP FM524 Substation 138kVBulldog Power II LLCGas turbine311.0Sep 2030In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Brazoria County?

FEMA flood maps for Brazoria County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Brazoria County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 12

Austin · Chambers · Colorado · Fort Bend · Galveston · Harris · Liberty · Matagorda · Montgomery · Walker · Waller · Wharton

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.