Milam County, Texas: solar, wind, and storage permits

Contacts checked 2026-09-26 · From official state and federal directories

Who to call and what to check for a solar, wind, or battery storage project in Milam County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Milam County?

The Milam County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Milam County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Milam County?

TCEQ Region 9, Waco
6801 Sanger Ave, Ste 2500, Waco TX 76710-7826
Main line: 254-751-0335 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Milam County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Milam County?

ERCOT's August 2026 interconnection report lists 29 proposed energy projects in Milam County (14 solar, 13 battery storage and 2 gas), about 8,286 MW in all. 16 of the 29 have a signed interconnection agreement, and 6 have been energized or approved to connect.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
Eastbell Milam Solar345 kV Bell County East Switch (bus# 3687) - TNP One (bus# 39950) c...EDP RENEWABLES NORTH AMERICA LLCSolar244.9Oct 2025Approved to connect
Sypert Branch Solar ProjectTap 345kV #3751 Scooter Switch - #3687 Bell County East Switch Ckt 2Sypert Branch Solar LLCSolar261.1Apr 2026Approved to connect
Eastbell Milam Solar II345 kV Bell County East Switch (bus# 3687) - TNP One (bus# 39950) c...Cattlemen Solar Park II LLCSolar150.6Jul 2026Approved to connect
Yaupon Solar SLFTap 345 kV Gibson Switch (3706) – TNP One (39950)Yaupon Solar, LLCSolar200.8Nov 2026Approved to connect
Stoneridge BESSTap 345 kV 13429 SANDOW SWITCH - 7040 AUSTROP CKT 2Stoneridge Solar, LLCBattery storage101.9Dec 2026Approved to connect
Stoneridge SolarTap 345 kV 13429 SANDOW SWITCH - 7040 AUSTROPStoneridge Solar, LLCSolar201.6Dec 2026Approved to connect
Hoyte Solar(3707) Cannon Switch 138kVMilano Solar LLCSolar206.8Apr 2027Under construction
Adelite StorageTap 138kV Thorndale North (bus #3659) – Rookie Switch (bus #3701)Adelite Storage Project LLCBattery storage (stand-alone)231.9Jun 2027Signed; security posted
Camino Santiago Solar345 kV Herndon Switch Substation (#3804)Camino Solar Project, LLCSolar196.3Sep 2027Signed; security posted
Sandow Solartap one 345kV 7040 Austrop - 13429 Sandow lineSandow Lakes Ranch Solar I, LLCSolar287.2Jun 2028Signed; security posted
Yaupon Storage SLFto Tap 345 kV Gibson Switch (3706) – TNP One (39950)Yaupon Solar, LLCBattery storage (paired with solar)Self-limitingJul 2028Signed; security posted
Happy Dog StorageTap 345kV 3704 Hog Creek Switch – 3687 Bell County East SwitchRosula Storage LLCBattery storage (paired with solar)104.5Aug 2027Signed Dec 2024
HappyDogSolarTap 345kV 3704 Hog Creek Switch – 3687 Bell County East SwitchRosula Solar LLCSolar85.5Aug 2027Signed Dec 2024
San Gabriel SolarTap 138 kV 3750 Vosslake - 3749 BuckholtsSan Gabriel Solar LLCSolar255.0Jul 2028Signed Aug 2026
San Gabriel StorageTap 138 kV 3750 Vosslake - 3749 BuckholtsSan Gabriel Solar LLCBattery storage (paired with solar)127.5Jul 2028Signed Aug 2026
Rhoda StorageTap 138kV 32 Robertson - 64 MilanoMilam Energy, LLCBattery storage (stand-alone)141.2Aug 2028Signed Dec 2025
Betel Storage I3377 Little Pond Switch ( LTPSW) 345BETEL STORAGE IBattery storage (stand-alone)500.0Aug 2026In study
Aquila Solar3706 Gibson Switch 345kVBen Milam Solar 5Solar500.0Nov 2026In study
Betel Storage II3377 Little Pond 345BETEL STORAGE IIBattery storage (stand-alone)500.0Dec 2026In study
Burgos Solar3701 Rookie Switch 138 kVTwin Oaks Solar, LLCSolar105.5Nov 2027In study
Champs Elysees BESSTap 345 kV 3377 Little Pond Switch - 3704 Hog Creek SwitchChamps Elysees Renewables, LLCBattery storage (stand-alone)256.1Dec 2027In study
Sandow Lakes Energy Station#13430 Sandow Switch 138kVSL Energy Power Plant I, LLCGas turbine1,291.6Apr 2028In study
Petunia Storage Project138kV Tap 3675 Rogers - 3485 Tin Roof PodPetunia Storage Project LLCBattery storage (stand-alone)231.9Jun 2028In study
Pavo Creek StorageTap #3659 Thorndale North - #3701 Rookie Switch 138 kVPavo Creek Storage, LLCBattery storage (stand-alone)154.2Sep 2028In study
Obbligato BESSTap 138kV 120# TALBRTRIDG – 3683# MINERVA1_8Obbligato BESS, LLCBattery storage (stand-alone)200.7Feb 2029In study
Brahman Renewables SolarTap Voss Lake switch #3751 – Badger Switch #3761 345 kVBrahman RenewablesSolar100.6May 2029In study
Brahman Renewables StorageTap Voss Lake switch #3751 – Badger Switch #3761 345 kVBrahman RenewablesBattery storage (paired with solar)203.1May 2029In study
Scorpius Solar3377 LTPSW 345KVBen Milam Solar 4Solar600.0Jun 2029In study
MilamStation Power Secured Gas GenerationLittle Pond Switch (Bus #3377) – Hog Creek Switch (Bus #3704) 345 k...LCC-TX8, LLCGas combined cycle846.0Sep 2029In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Milam County?

FEMA flood maps for Milam County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Milam County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 9

Bell · Bosque · Brazos · Burleson · Coryell · Falls · Freestone · Grimes · Hamilton · Hill · Lampasas · Leon · Limestone · Madison · McLennan · Mills · Robertson · San Saba · Washington

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.