Quicksand Check

Home › Texas permits › Leon County

Leon County, Texas: solar, wind, and storage permits

Contacts checked 2026-09-26 · From official state and federal directories

Who to call and what to check for a solar, wind, or battery storage project in Leon County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Leon County?

The Leon County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Leon County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Leon County?

TCEQ Region 9, Waco
6801 Sanger Ave, Ste 2500, Waco TX 76710-7826
Main line: 254-751-0335 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Leon County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Leon County?

ERCOT's August 2026 interconnection report lists 11 proposed energy projects in Leon County (5 solar, 5 battery storage and 1 gas), about 4,106 MW in all. 4 of the 11 have a signed interconnection agreement.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
Great Rock BESSTap 345kV 46020 Limestone - 967 Gibbon Creek Ckt 18Great Rock Storage LLCBattery storage (stand-alone)300.9Dec 2027Under construction
Pecan Prairie NorthCTT Yellow Wolf, bus # 79007CG Leon County II LLCSolar324.1May 2027Signed; security posted
Pecan Prairie SouthCTT Yellow Wolf, bus # 79007ConnectGen Operating LLCSolar133.0May 2027Signed; security posted
Hollow Branch Creek SolarTap 345kV 3390 Jewett - 44645 SingletonHollow Branch Creek Solar LLCSolar460.0Jun 2028Signed; security posted
Nickel Spruce SolarTap 138kV 6735 Pleasant Springs Switching Station - 6736 MiddlNickel Spruce Solar LLCSolar150.0Dec 2027In study
Leon BESSTab 138kv 3355 Grapeland_Magnolia - 3357 Pleasant_Springs.Leon BESSBattery storage (paired with solar)153.7Feb 2028In study
Dempsey Solar SLFTap 138 KV Ridge (#37)-Robertson (#32) line; BEPCDempsey Solar LLCSolar245.3Sep 2028In study
Dempsey Storage SLFTap the 138 KV Ridge (#37)-Robertson (#32) line; BEPCDempsey Storage LLCBattery storage (paired with solar)Self-limitingSep 2028In study
Kahla StorageTap 345kV 46020 Limestone 967 Gibbons Creek Circuit 50BT Kahla Storage, LLCBattery storage (stand-alone)200.9Dec 2028In study
Pecan BESS(PSSE BUS# 47) HILTOPLKS8 138kVGransolar Texas Three LLCBattery storage (stand-alone)157.1Dec 2028In study
BM Great Rock Energy CenterTap <345kV> <967> <GIBN_CREK_5> - <46020> <LIMEST_POI_5> Ckt<18> an...Black Mountain Energy Storage IIGas combined cycle1,981.2May 2029In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Leon County?

FEMA flood maps for Leon County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Leon County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 9

Bell · Bosque · Brazos · Burleson · Coryell · Falls · Freestone · Grimes · Hamilton · Hill · Lampasas · Limestone · Madison · McLennan · Milam · Mills · Robertson · San Saba · Washington

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.