Quicksand Check

Home › Texas permits › Hill County

Hill County, Texas: solar, wind, and storage permits

Contacts checked 2026-09-26 · From official state and federal directories

Who to call and what to check for a solar, wind, or battery storage project in Hill County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Hill County?

The Hill County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Hill County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Hill County?

TCEQ Region 9, Waco
6801 Sanger Ave, Ste 2500, Waco TX 76710-7826
Main line: 254-751-0335 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Hill County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Hill County?

ERCOT's August 2026 interconnection report lists 23 proposed energy projects in Hill County (9 solar, 2 wind, 9 battery storage and 3 gas), about 7,874 MW in all. 12 of the 23 have a signed interconnection agreement, and 4 have been energized or approved to connect.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
Compadre Solartap 345kV 68090 Sam Switch - 1907 VenusHill Solar I, LLCSolar405.7Jul 2026Approved to connect
Three W Solartap 138kV 3522 Hillboro1_8 - 237 Blanton CKT 1Three W Solar LLCSolar110.9Sep 2026Approved to connect
Compadre Solar IITap 345kV 68090 Sam Switch – 3389 Fort SmithHill Solar II, LLCSolar201.4Oct 2026Approved to connect
Aquilla Lake 3 Windtap 345 kV 68040 Kopperl to 68091 NavarroAquilla Lake 3 WindWind297.4Nov 2026Approved to connect
Vial BESSChatt(234) - Pecan Street (3352) 138kVGransolar Texas Eleven LLCBattery storage (stand-alone)135.2Sep 2027Signed; security posted
OCI Cobb Creek Solartap 345kV 1907 Venus - 68090 Sam SwHillsboro Solar Project LLCSolar203.1Dec 2027Signed; security posted
Blue Skies BESS68090 SAM SW 345kVACTX BESS Project LLCBattery storage (stand-alone)306.3Apr 2028Signed; security posted
High Noon SolarTap 138kV 445 Yates - 444 CovingtonHigh Noon Solar Project, LLCSolar182.0May 2028Signed; security posted
High Noon StorageTap 138kV 445 Yates - 444 CovingtonHigh Noon Solar Project, LLCBattery storage (paired with solar)94.0May 2028Signed; security posted
OCI Cobb Creek ESStap 345kV 1907 Venus - 68090 Sam SwHillsboro Solar Project LLCBattery storage (paired with solar)201.6Dec 2028Signed; security posted
Mercury Solar III68092 Liberty Station 345kVMercury SolarSolar203.5Apr 2029Signed; security posted
Payne Battlecreektap 138kV 213 Haney - 3515 HubbardGransolar Texas Ten, LLCSolar85.0Aug 2027Signed Feb 2024
Files BESS SLFTap 345kV Bus1#152333 FILES Solar - BUS2#3389 Fort Smith SwitchFiles BESSBattery storage (stand-alone)34.0Dec 2027In study
Edens SolarTap 69kV 3532 Itasca - 3523 HillsboroHill PV, LLCSolar70.8Apr 2028In study
HILLBORO BESSTap 138kV Ash Creek Switch (Bus #3473) – Revolution Switch (Bus #3387)Abei Energy Green XI LLCBattery storage (paired with wind)130.9Sep 2028In study
HILLBORO WINDTap 138kV Ash Creek Switch (Bus #3473) – Revolution Switch (Bus #3387)Abei Energy Green XI LLCWind33.2Sep 2028In study
Seven Angels Energy Storage I68090 Sam Switch Bus 345kVSeven Angels Infrastructure LLCBattery storage (stand-alone)514.0Dec 2028In study
Seven Angels Energy Storage II68090 Sam Switch Bus 345kVSeven Angels Infrastructure LLCBattery storage (stand-alone)514.0Dec 2028In study
Mercury Storage SLF68092 Liberty Station 345kVMercury Storage, LLCBattery storage (paired with solar)Self-limitingJul 2029In study
Penelope SolarNew sub in the 234 Chatt - 3473 Ash Creek 138kV lineAsh Creek Project LLCSolar97.8Sep 2029In study
NRG Prairie Energy CenterTap #1907 Venus Switch – #3389 Fort Smith Switch 345 kVNRG Prairie Energy Center LLCGas combined cycle1,253.0Dec 2030In study
Bullock GasBULLOCK 345 KV STATION (Bus# 68096)Bullock Data Center, LLCGas combined cycle1,400.0Jul 2032In study
Liberty Thermal Energy CenterLIBERTY 345 KV STATION (Bus# 68092)Liberty Data Center I, LLCGas combined cycle1,400.0Jul 2032In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Hill County?

FEMA flood maps for Hill County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Hill County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 9

Bell · Bosque · Brazos · Burleson · Coryell · Falls · Freestone · Grimes · Hamilton · Lampasas · Leon · Limestone · Madison · McLennan · Milam · Mills · Robertson · San Saba · Washington

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.