Home › Texas permits › Wise County
Wise County, Texas: solar, wind, and storage permits
Who to call and what to check for a solar, wind, or battery storage project in Wise County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.
Who handles property records and taxes in Wise County?
The Wise County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.
Wise County directory (Texas Comptroller)Lease rates and rollback taxes
Which TCEQ office covers Wise County?
TCEQ Region 4, Dallas/Fort Worth
2309 Gravel Dr, Fort Worth TX 76118-6951
Main line: 817-588-5800 · Spills, 24 hours: 800-832-8224
Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.
TCEQ region directoryConstruction stormwater permit
Does Wise County have zoning or a solar permit?
Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.
What energy projects are proposed in Wise County?
ERCOT's August 2026 interconnection report lists 11 proposed energy projects in Wise County (1 solar, 9 battery storage and 1 gas), about 3,974 MW in all. 1 of the 11 has a signed interconnection agreement.
Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.
Scroll the table sideways to see every column.
| Project and connection point | Developer | Type | MW | Projected in service | Stage |
|---|---|---|---|---|---|
| Wise County Power Repower (CT1, CT2)1421 Willow Creek 345kV | Wise County Power Company LLC | Gas combined cycle | 21.0 | Dec 2026 | Signed; security posted |
| Pianissimo BESS IITap 138kV 685 LEO - 587 GREENWOOD | Pianissimo Storage, LLC | Battery storage (stand-alone) | 202.0 | Dec 2027 | In study |
| Prairie Point Energy Storage IRAMHORNH_5 - 31875 | Prairie Point LLC | Battery storage (stand-alone) | 1,000.0 | Dec 2027 | In study |
| Prairie Point Energy Storage IIRAMHORNH_5 - 31875 | Prairie Point LLC | Battery storage (stand-alone) | 1,000.0 | Dec 2027 | In study |
| Gilleys Energy StorageTap 345 kV 1730 West Krum - 6111 Riley CKT 2 | Gilleys Energy Storage, LLC | Battery storage (stand-alone) | 306.4 | Apr 2028 | In study |
| Legato BESS138kV #608 Crafton Substation - #620 Bowie Substation | Legato Storage, LLC | Battery storage (stand-alone) | 202.7 | Apr 2028 | In study |
| Yooperlite StorageTap 138 kV 580 Westbrook Switch - 588 Willow | BT Yooperlite Storage, LLC | Battery storage (stand-alone) | 175.7 | May 2028 | In study |
| Sandford SolarTap 345kV Bird Dog (Bus #11736) - Jacksboro (Bus #1429) | BT Sandford Solar, LLC | Solar | 126.2 | Jan 2029 | In study |
| Sandford StorageTap 345kV Bird Dog (Bus #11736) - Jacksboro (Bus #1429) | BT Sandford Solar, LLC | Battery storage (paired with solar) | 100.9 | Jan 2029 | In study |
| Spur Energy StorageTap 345kV (1429) JACKSBRO_5 - (11736) BIRDDOG_5 | Spur Energy Storage, LLC | Battery storage (stand-alone) | 612.6 | Sep 2029 | In study |
| Solar Star Rhome Storage576 RHOME 138kV | Solar Star Rhome Storage | Battery storage (stand-alone) | 226.2 | Sep 2029 | In study |
Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.
Where are the flood maps for Wise County?
FEMA flood maps for Wise County
How does a project here connect to the grid?
Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.
Interconnection by market and utilityERCOT resource integration
What state and federal reviews can apply?
Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.
Statewide and federal contactsTexas decommissioning law
Check a specific property in Wise County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 4
Collin · Cooke · Dallas · Denton · Ellis · Erath · Fannin · Grayson · Hood · Hunt · Johnson · Kaufman · Navarro · Palo Pinto · Parker · Rockwall · Somervell · Tarrant