Quicksand Check

Home › Texas permits › Kaufman County

Kaufman County, Texas: solar, wind, and storage permits

Contacts checked 2026-09-26 · From official state and federal directories

Who to call and what to check for a solar, wind, or battery storage project in Kaufman County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Kaufman County?

The Kaufman County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Kaufman County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Kaufman County?

TCEQ Region 4, Dallas/Fort Worth
2309 Gravel Dr, Fort Worth TX 76118-6951
Main line: 817-588-5800 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Kaufman County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Kaufman County?

ERCOT's August 2026 interconnection report lists 16 proposed energy projects in Kaufman County (6 solar, 1 wind and 9 battery storage), about 2,075 MW in all. 4 of the 16 have a signed interconnection agreement, and 1 has been energized or approved to connect.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
Erika SolarTap 345kV ELKTON 5 (#3105 ) to Tricrn1 5 (#2432)Erika Solar, LLCSolar200.5Nov 2026Approved to connect
Sowers Storage6894 Rose Hill_RC Sub 138 kVSowers Energy Storage LLCBattery storage (stand-alone)208.9Jul 2027Signed; security posted
Mystic Springs Renewable Energy Solar SLFTap 345 kV Royse Switch (2478) – Poetry Switch (2485)Mystic Spring Renewable Energy LLCSolar258.8Mar 2028Signed Oct 2025
LUBIO SOLARtap 138kV 2727 Crandall - 2724 Kaufman NorthwestBDPU Solar Lubio LLCSolar54.7Apr 2028Signed Nov 2024
Sunbelt Solartap 138kV 6902 Talty - 6801 PattonRose Hill Solar LLCSolar81.5Dec 2026In study
Sunbelt StorageTap 138kV 6902 Talty - 6894 Rose HillRose Hill Solar LLCBattery storage (paired with solar)52.0Dec 2026In study
Fudge Ranch BESS<6902><TALTY_RC><138kV>Crandall BESS LLCBattery storage (stand-alone)104.0Jun 2027In study
Mystic Springs Renewable Energy Storage SLFTap 345 kV Royse Switch (2478) – Poetry Switch (2485)Mystic Spring Renewable Energy LLCBattery storage (paired with solar)Self-limitingMar 2028In study
Solarville BESS SLFTap 345 kV (#2432)Tri Corner - (#3105) ElktonVille Solar, LLCBattery storage (paired with solar)Self-limitingSep 2028In study
Solarville Wind SLFTap 345 kV (#2432)Tri Corner - (#3105) ElktonVille Solar, LLCWindSelf-limitingSep 2028In study
Yellow Leaf BESSTap 138kV Crandall (#2727) – Kaufman Northwest (#2724)Lightsource Renewable Energy Development LLCBattery storage (paired with solar)103.1Sep 2028In study
Yellow Leaf II BESSTap 138kV 2727 CRANDALL1_8 - 2724 KAUFMN_8Yellow Leaf Energy Storage LLCBattery storage (paired with solar)205.7Sep 2028In study
Yellow Leaf SolarTap 138kV Crandall (#2727) – Kaufman Northwest (#2724)Lightsource Renewable Energy Development LLCSolar103.2Sep 2028In study
Erika BESSTap 345kV ELKTON 5 (#3105 ) to Tricrn1 5 (#2432)Erika Solar, LLCBattery storage (paired with solar)100.0Jul 2029In study
Solarville Solar SLFTap 345kV #3123 Trinidad Switch – #2432 Tri Corner.Ville Solar, LLCSolar402.9Jul 2029In study
Slash Pine Storage1698 Sulphur Springs Switch and 3174 Canton Switch 138 kVEG Slash Pine LLCBattery storage (stand-alone)200.0Sep 2029In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Kaufman County?

FEMA flood maps for Kaufman County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Kaufman County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 4

Collin · Cooke · Dallas · Denton · Ellis · Erath · Fannin · Grayson · Hood · Hunt · Johnson · Navarro · Palo Pinto · Parker · Rockwall · Somervell · Tarrant · Wise

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.