Ward County, Texas: solar, wind, and storage permits

Contacts checked 2026-09-26 · From official state and federal directories

Who to call and what to check for a solar, wind, or battery storage project in Ward County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Ward County?

The Ward County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Ward County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Ward County?

TCEQ Region 7, Midland
10 Desta Dr, Ste 350E, Midland TX 79705-4530
Main line: 432-570-1359 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Ward County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Ward County?

ERCOT's August 2026 interconnection report lists 12 proposed energy projects in Ward County (2 solar, 5 battery storage and 5 gas), about 3,325 MW in all. 4 of the 12 have a signed interconnection agreement.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
Staghorn GasSTATION NAME: STAGHORNRPC Merchant LLCGas engines10.0Oct 2026Signed; security posted
Vast Sands Power I (TEF -Due Diligence)Tap 345kV 11010 Wolf Switch - 11188 Quarry Field Switch Ckt 2Permian Power I LLCGas turbine440.0May 2028Signed; security posted
Vast Sands Power II (TEF-Due Diligence)Tap 345kV 11010 Wolf Switch - 11188 Quarry Field Switch Ckt 2Permian Power I LLCGas turbine440.0Jun 2028Signed; security posted
BasRanch (TEF - Due Diligence)tap 345kV Riverton Switch - Sand Lake SwitchCPV Basin Ranch, LLCGas combined cycle1,350.0Dec 2028Signed; security posted
FLIFER Solar ITap 138 kV Yucca Drive Switch (bus# 1009) – Sand Tank (bus# 11197)FLIFER LLCSolar84.0Apr 2027In study
Frizzle BESS#38143, TNSLVRLEAF1, 138kVFrizzle BESS, L.L.C.Battery storage (stand-alone)180.9Oct 2027In study
Proteus Thornton Ranch Solar SLF37990 TNSTAGHORN1 138kVThornton Ranch Solar, LLCSolar180.0Nov 2028In study
Proteus Thornton Ranch Storage SLF37990 TNSTAGHORN1 138kVThornton Ranch Solar, LLCBattery storage (paired with solar)Self-limitingNov 2028In study
BRP Pyxis BESStap 138kV 1009 Yucca - 11197 Sand Tank PodBRP Pyxis BESS LLCBattery storage (stand-alone)206.9Dec 2028In study
BRP Rhine BESSTap 345kV 11188 QUARRYFLD - 11010 WOLFBRP Rhine BESS LLCBattery storage (stand-alone)206.9Dec 2028In study
New Minglewood Energy Center#11098 Sand Lake Switch Station (SANDLAKE_5) 345kVNova Clean Energy LLCBattery storage (stand-alone)208.3Sep 2029In study
Monahans Power Gas11117 PECOSTRAIL_8 138kVLiberty Power Innovations LLCGas engines18.2Apr 2030In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Ward County?

FEMA flood maps for Ward County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Ward County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 7

Andrews · Borden · Crane · Dawson · Ector · Gaines · Glasscock · Howard · Loving · Martin · Midland · Pecos · Reeves · Terrell · Upton · Winkler

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.