Glasscock County, Texas: solar, wind, and storage permits

Contacts checked 2026-09-26 · From official state and federal directories

Who to call and what to check for a solar, wind, or battery storage project in Glasscock County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Glasscock County?

The Glasscock County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Glasscock County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Glasscock County?

TCEQ Region 7, Midland
10 Desta Dr, Ste 350E, Midland TX 79705-4530
Main line: 432-570-1359 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Glasscock County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Glasscock County?

ERCOT's August 2026 interconnection report lists 18 proposed energy projects in Glasscock County (3 solar, 7 wind, 7 battery storage and 1 gas), about 3,409 MW in all. 12 of the 18 have a signed interconnection agreement, and 5 have been energized or approved to connect.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
Harald (BearKat Wind B)59903 Bearkat 345kVMcCrae Wind Energy II, LLCWind162.1Dec 2026Approved to connect
Honey Mesquite Wind Farm59902 Sand Bluff 345kVHoney Mesquite Wind Farm , LLCWind173.9Dec 2026Approved to connect
Forest Creek Wind RepowerMcdonald 138 kV (Bus #: 1333)Forest Creek Wind Farm, LLCWind125.1Dec 2026Approved to connect
Panther Creek 1 Repower1058 Longshore 345kVPanther Creek Wind Farm I&II, LLCWind11.0Dec 2026Approved to connect
Panther Creek 2 RepowerLongshore 345kV [Bus# 1058]Panther Creek Wind Farm I&II, LLCWind8.0Dec 2026Approved to connect
Pleiades StorageTap 138kV Einstein 23852 - 10043 St. LawrencePleiades Storage, LLCBattery storage (stand-alone)205.5Sep 2029Under construction
Champaign BESSTap 138kV Shaw POD (18664) – Desert Wind Sub (11222)Champaign BESS, LLCBattery storage (stand-alone)201.1Mar 2028Signed; security posted
Cannibal Draw SolarSand_Bluff 345 kV (59902)Cannibal Draw Solar, LLCSolar149.5Apr 2028Signed; security posted
Cannibal Draw StorageSand_Bluff 345 kV (59902)Cannibal Draw Solar, LLCBattery storage (paired with solar)98.6Apr 2028Signed; security posted
Gusty WindpowerTap 345kV 59903 Bearkat - 1058 Longshore_5; Anemone 345 kV StationGusty Windpower, LLCWind248.9Dec 2028Signed; security posted
Windjammer Windpowertap 345kV 59902 Sand Bluff Wind Farm - 59907 BernoulliWindjammer Windpower, LLCWind244.1Dec 2028Signed; security posted
Gardner Draw Solar59902 Sand Bluff 345kVRWE Clean Energy Development, LLCSolar309.5Dec 2027Signed Aug 2025
Feather Dalea BESS59902 Sand_Bluff 345kVRWE Clean Energy Development, LLCBattery storage (stand-alone)200.0Jul 2027In study
Sagewood BESStap McDonald Road Switch (1333) – Pastores Switch (10121) ckt 1Sagewood BESS, LLCBattery storage (stand-alone)100.6Mar 2028In study
Cummins BESS1333 MCDONALD 138kVRWE Solar Development, LLCBattery storage (stand-alone)200.9Jun 2028In study
Proteus London-Leigh Solar SLF345kV Bernoulli (bus # 59907)London Leigh Solar, LLCSolar600.0Sep 2028In study
Proteus London-Leigh Storage SLFBernoulli (bus # 59907)London Leigh Solar, LLCBattery storage (paired with solar)Self-limitingSep 2028In study
Indigo Quill Gas59902 SAND_BLUFF 345KVRWE Clean Energy Development, LLCGas turbine370.1Dec 2028In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Glasscock County?

FEMA flood maps for Glasscock County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Glasscock County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 7

Andrews · Borden · Crane · Dawson · Ector · Gaines · Howard · Loving · Martin · Midland · Pecos · Reeves · Terrell · Upton · Ward · Winkler

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.