Home › Texas permits › Reeves County
Reeves County, Texas: solar, wind, and storage permits
Who to call and what to check for a solar, wind, or battery storage project in Reeves County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.
Who handles property records and taxes in Reeves County?
The Reeves County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.
Reeves County directory (Texas Comptroller)Lease rates and rollback taxes
Which TCEQ office covers Reeves County?
TCEQ Region 7, Midland
10 Desta Dr, Ste 350E, Midland TX 79705-4530
Main line: 432-570-1359 · Spills, 24 hours: 800-832-8224
Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.
TCEQ region directoryConstruction stormwater permit
Does Reeves County have zoning or a solar permit?
Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.
What energy projects are proposed in Reeves County?
ERCOT's August 2026 interconnection report lists 24 proposed energy projects in Reeves County (5 solar, 2 wind, 5 battery storage, 9 gas and 3 oil), about 8,301 MW in all. 9 of the 24 have a signed interconnection agreement.
Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.
Scroll the table sideways to see every column.
| Project and connection point | Developer | Type | MW | Projected in service | Stage |
|---|---|---|---|---|---|
| COYOTE SPRINGS AGR1Station Name: COYOTSPR | HEN INFRASTRUCTURE, LLC 1 | Oil | 9.9 | Jun 2026 | Signed; security posted |
| SADDLEBACK AGR1SADLBACK/SADLBK_1/38058/SADLBACK_LD8 | HEN INFRASTRUCTURE, LLC 1 | Oil | 9.9 | Jun 2026 | Signed; security posted |
| Tolivar Power Plant (TEF- Due Diligence)Tap 138 KV 38045 IH20-38043 COWPEN | Pecos Power Plant, LLC | Gas engines | 224.5 | Jun 2027 | Signed; security posted |
| Bracero Pecan Storage60716 SARAGOSA 138kV | Bracero Pecan Storage LLC | Battery storage (stand-alone) | 238.2 | Jul 2027 | Signed; security posted |
| Tolivar Power Plant Phase 2Tap 138 KV 38055 Saltdraw-38043 COWPEN | Pecos Power Plant, LLC | Gas engines | 224.5 | Sep 2027 | Signed; security posted |
| August Draw SolarTap 138kV 60207 Verhalen – 60808 Hoefs Road | August Draw Solar Holdings, LLC | Solar | 250.0 | Jun 2028 | Signed; security posted |
| Cantaloupe Solar60716 Saragosa 138kV | Saragosa Del Sol Energy, LLC | Solar | 307.0 | Jul 2028 | Signed; security posted |
| Nanulak BESS38113 TNCOYOTSPG1 138kV | Nanulak BESS, L.L.C. | Battery storage (stand-alone) | 181.5 | Mar 2027 | Signed Nov 2025 |
| Blue Heron BESSTap 138kV MANSON (1094) - Riverton (11083) | Blue Heron BESS, LLC | Battery storage (stand-alone) | 201.1 | Oct 2028 | Signed Jul 2026 |
| Exergy Energy West Texas Natural Gas Reciprocating Power I38095 TNJACKRBT1 138kV | August Partners LLC | Gas engines | 400.0 | May 2027 | In study |
| Kodiak AGR138113 TNCOYOTSPG1 | Hunt Energy Network, LLC | Oil | 132.0 | Jun 2027 | In study |
| Kilby1 Part 1 Small Block Simple Cycle#60404 Solstice Substation 345 kV | Energy Forge One LLC | Gas turbine | 371.0 | Nov 2027 | In study |
| AGGIE STORAGE PROJECT SLFPOI: COYOTE SPRINGS SUBSTATION - 138KV | reNRG TX 8 LLC | Battery storage (paired with solar) | Self-limiting | Nov 2027 | In study |
| Aggie Solar Project SLFPOI: COYOTE SPRINGS SUBSTATION - 138KV | reNRG TX 8 LLC | Solar | 103.7 | Nov 2027 | In study |
| Alpha Digital Campus Combined-cycle and Co-located Load38044 TNCOWPEN__3 345kV | PowerBridge LLC | Gas combined cycle | 58.3 | Dec 2027 | In study |
| Kilby1 Part 2 Tier1 BESS#60404 Solstice Substation 345 kV | Energy Forge One LLC | Battery storage (paired with gas) | 330.0 | Jan 2028 | In study |
| Neptune Gas Generation Plant11200 Longpast_T8 138kv | BPX Production Company | Gas engines | 113.8 | Mar 2028 | In study |
| Kilby1 Part 4 Large Block Simple Cycle#60404 Solstice Substation 345 kV | Energy Forge One LLC | Gas turbine | 950.0 | Apr 2028 | In study |
| Glass Mountain Wind 1Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5 | Glass Mountain Wind, LLC | Wind | 511.5 | Dec 2028 | In study |
| Glass Mountain Wind 2Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5 | Glass Mountain Wind, LLC | Wind | 519.2 | Dec 2028 | In study |
| Trumpet Solartap 345kV 18723 Drylake_5 – 38125 TNFaulkner3 | NextEra Energy Resources Interconnection Holdings LLC | Solar | 455.0 | Jul 2029 | In study |
| Kilby1 Part 6 Large Block Combined Cycle#60404 Solstice Substation 345 kV | Energy Forge One LLC | Gas combined cycle | 1,056.0 | Jul 2029 | In study |
| Wolf Bone North Energy Center (OLD)Tap 345 kV 60404 SOLTICE7A - 18669 TOYAHCRK_5 Ckt 1 | NRG Wolf Bone Energy Center LLC | Gas combined cycle | 1,204.0 | Nov 2029 | In study |
| Capshaw SolarPOIB: Tapping Drylake_5 (#18723) – TNFaulkner3 (#38125) 345 kV | NextEra Energy Resources Interconnection Holding, LLC | Solar | 450.0 | Jul 2030 | In study |
Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.
Where are the flood maps for Reeves County?
FEMA flood maps for Reeves County
How does a project here connect to the grid?
Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.
Interconnection by market and utilityERCOT resource integration
What state and federal reviews can apply?
Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.
Statewide and federal contactsTexas decommissioning law
Check a specific property in Reeves County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 7
Andrews · Borden · Crane · Dawson · Ector · Gaines · Glasscock · Howard · Loving · Martin · Midland · Pecos · Terrell · Upton · Ward · Winkler