Reeves County, Texas: solar, wind, and storage permits

Contacts checked 2026-09-26 · From official state and federal directories

Who to call and what to check for a solar, wind, or battery storage project in Reeves County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Reeves County?

The Reeves County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Reeves County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Reeves County?

TCEQ Region 7, Midland
10 Desta Dr, Ste 350E, Midland TX 79705-4530
Main line: 432-570-1359 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Reeves County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Reeves County?

ERCOT's August 2026 interconnection report lists 24 proposed energy projects in Reeves County (5 solar, 2 wind, 5 battery storage, 9 gas and 3 oil), about 8,301 MW in all. 9 of the 24 have a signed interconnection agreement.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
COYOTE SPRINGS AGR1Station Name: COYOTSPRHEN INFRASTRUCTURE, LLC 1Oil9.9Jun 2026Signed; security posted
SADDLEBACK AGR1SADLBACK/SADLBK_1/38058/SADLBACK_LD8HEN INFRASTRUCTURE, LLC 1Oil9.9Jun 2026Signed; security posted
Tolivar Power Plant (TEF- Due Diligence)Tap 138 KV 38045 IH20-38043 COWPENPecos Power Plant, LLCGas engines224.5Jun 2027Signed; security posted
Bracero Pecan Storage60716 SARAGOSA 138kVBracero Pecan Storage LLCBattery storage (stand-alone)238.2Jul 2027Signed; security posted
Tolivar Power Plant Phase 2Tap 138 KV 38055 Saltdraw-38043 COWPENPecos Power Plant, LLCGas engines224.5Sep 2027Signed; security posted
August Draw SolarTap 138kV 60207 Verhalen – 60808 Hoefs RoadAugust Draw Solar Holdings, LLCSolar250.0Jun 2028Signed; security posted
Cantaloupe Solar60716 Saragosa 138kVSaragosa Del Sol Energy, LLCSolar307.0Jul 2028Signed; security posted
Nanulak BESS38113 TNCOYOTSPG1 138kVNanulak BESS, L.L.C.Battery storage (stand-alone)181.5Mar 2027Signed Nov 2025
Blue Heron BESSTap 138kV MANSON (1094) - Riverton (11083)Blue Heron BESS, LLCBattery storage (stand-alone)201.1Oct 2028Signed Jul 2026
Exergy Energy West Texas Natural Gas Reciprocating Power I38095 TNJACKRBT1 138kVAugust Partners LLCGas engines400.0May 2027In study
Kodiak AGR138113 TNCOYOTSPG1Hunt Energy Network, LLCOil132.0Jun 2027In study
Kilby1 Part 1 Small Block Simple Cycle#60404 Solstice Substation 345 kVEnergy Forge One LLCGas turbine371.0Nov 2027In study
AGGIE STORAGE PROJECT SLFPOI: COYOTE SPRINGS SUBSTATION - 138KVreNRG TX 8 LLCBattery storage (paired with solar)Self-limitingNov 2027In study
Aggie Solar Project SLFPOI: COYOTE SPRINGS SUBSTATION - 138KVreNRG TX 8 LLCSolar103.7Nov 2027In study
Alpha Digital Campus Combined-cycle and Co-located Load38044 TNCOWPEN__3 345kVPowerBridge LLCGas combined cycle58.3Dec 2027In study
Kilby1 Part 2 Tier1 BESS#60404 Solstice Substation 345 kVEnergy Forge One LLCBattery storage (paired with gas)330.0Jan 2028In study
Neptune Gas Generation Plant11200 Longpast_T8 138kvBPX Production CompanyGas engines113.8Mar 2028In study
Kilby1 Part 4 Large Block Simple Cycle#60404 Solstice Substation 345 kVEnergy Forge One LLCGas turbine950.0Apr 2028In study
Glass Mountain Wind 1Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5Glass Mountain Wind, LLCWind511.5Dec 2028In study
Glass Mountain Wind 2Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5Glass Mountain Wind, LLCWind519.2Dec 2028In study
Trumpet Solartap 345kV 18723 Drylake_5 – 38125 TNFaulkner3NextEra Energy Resources Interconnection Holdings LLCSolar455.0Jul 2029In study
Kilby1 Part 6 Large Block Combined Cycle#60404 Solstice Substation 345 kVEnergy Forge One LLCGas combined cycle1,056.0Jul 2029In study
Wolf Bone North Energy Center (OLD)Tap 345 kV 60404 SOLTICE7A - 18669 TOYAHCRK_5 Ckt 1NRG Wolf Bone Energy Center LLCGas combined cycle1,204.0Nov 2029In study
Capshaw SolarPOIB: Tapping Drylake_5 (#18723) – TNFaulkner3 (#38125) 345 kVNextEra Energy Resources Interconnection Holding, LLCSolar450.0Jul 2030In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Reeves County?

FEMA flood maps for Reeves County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Reeves County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 7

Andrews · Borden · Crane · Dawson · Ector · Gaines · Glasscock · Howard · Loving · Martin · Midland · Pecos · Terrell · Upton · Ward · Winkler

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.