Ector County, Texas: solar, wind, and storage permits
Who to call and what to check for a solar, wind, or battery storage project in Ector County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.
Who handles property records and taxes in Ector County?
The Ector County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.
Ector County directory (Texas Comptroller)Lease rates and rollback taxes
Which TCEQ office covers Ector County?
TCEQ Region 7, Midland
10 Desta Dr, Ste 350E, Midland TX 79705-4530
Main line: 432-570-1359 · Spills, 24 hours: 800-832-8224
Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.
TCEQ region directoryConstruction stormwater permit
Does Ector County have zoning or a solar permit?
Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.
What energy projects are proposed in Ector County?
ERCOT's August 2026 interconnection report lists 22 proposed energy projects in Ector County (11 solar, 10 battery storage and 1 gas), about 4,178 MW in all. 5 of the 22 have a signed interconnection agreement, and 2 have been energized or approved to connect.
Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.
Scroll the table sideways to see every column.
| Project and connection point | Developer | Type | MW | Projected in service | Stage |
|---|---|---|---|---|---|
| Greyhound SolarTap 345kV 11010 Wolf - 1018 Moss | Rockhound Solar 2, LLC dba "Greyhound Solar" | Solar | 335.4 | Jun 2026 | Approved to connect |
| Apple BESSStation Name - Apple | Apple Infra LLC | Battery storage (stand-alone) | 9.9 | Oct 2026 | Energized |
| EMPower Odessa (TEF - Due Diligence)Tap 138 kV 1110 EDWARDS TAP - 1102 JUDKINS | EMPOWER USA, LLC | Gas engines | 122.8 | Mar 2028 | Signed; security posted |
| Sisters Solartapping the 345 kV line connecting Moss Switch (Bus# 1018) to Wolf... | Oberon Solar LLC | Solar | 100.5 | Sep 2028 | Signed; security posted |
| Van Zandt Energy Storage1027 Odessa EHV Switch 138 kV | Rocky Mountain Energy Holdings, LLC | Battery storage (stand-alone) | 256.0 | May 2027 | Signed Mar 2025 |
| Momentum Hazy Jane BESSTap 138kV 1102 Judkins - 1110 Edward | MOMENTUM HAZY JANE, LLC | Battery storage (stand-alone) | 125.5 | Feb 2028 | In study |
| Seragio BESS11140 ECTRCNTYN_8 138kV | Seragio BESS, LLC | Battery storage (stand-alone) | 201.1 | Apr 2028 | In study |
| M-Bar BESS I1141 Holt Switch Substation 138 kV | M-Bar Energy I, LLC | Battery storage (paired with solar) | 82.1 | Sep 2028 | In study |
| M-Bar Solar I1141 Holt Switch Substation 138kV | M-Bar Energy I, LLC | Solar | 30.2 | Sep 2028 | In study |
| Ophelia SolarTap 138 kV Raceway Switch #18663 - Shin Oak POD #11128 | Ophelia Solar | Solar | 110.5 | Sep 2028 | In study |
| Sisters Solar - Phase 210009 McGee 345 kV | Oberon Solar IV, LLC | Solar | 201.5 | Sep 2028 | In study |
| Sisters Solar IItap 345kV 11010 Wolf Switching Station - 10012 Meteor | Oberon Solar III, LLC | Solar | 205.5 | Dec 2028 | In study |
| GPlains SolarTap 138kV #1013 WOLFSS_8 - #1103 SANDHLTA_8 | Gypsum Plains Solar, LLC | Solar | 151.3 | Jun 2029 | In study |
| GPlains StorageTap 138kV WOLFSS_8 (1013) - SANDHLTA_8 (1103) | Gypsum Plains Solar, LLC | Battery storage (paired with solar) | 51.3 | Jun 2029 | In study |
| Gypsum Plains SolarTap 345kv line Wolf BUS# 11010 - Reiter BUS#18544 | Gypsum Plains Solar, LLC | Solar | 503.1 | Jun 2029 | In study |
| Gypsum Plains StorageTap 345kv 11010 Wolf - 18544 Reiter | Gypsum Plains Solar, LLC | Battery storage (paired with solar) | 211.1 | Jun 2029 | In study |
| Firebird BESSTap 138kV #1099 Southwestern Portland Tap - #1052 Rexall | TX BESS 6, LLC | Battery storage (stand-alone) | 102.7 | Jun 2029 | In study |
| Velociraptor BESS I10012 METEOR_5 Substation 345kV | Velociraptor BESS I, LLC | Battery storage (paired with solar) | 246.0 | Dec 2029 | In study |
| Velociraptor BESS IITap Wolf (#11010) - Reiter Switch (#18544) Ckt1 345KV | Velociraptor BESS II, LLC | Battery storage (paired with solar) | 246.1 | Dec 2029 | In study |
| Velociraptor Solar I#10012 METEOR 5 Substation 345kV | Velociraptor Solar I, LLC | Solar | 241.7 | Dec 2029 | In study |
| Velociraptor Solar IITap Wolf (#11010) - Reiter Switch (#18544) Ckt1 345KV | Velociraptor Solar II, LLC | Solar | 241.8 | Dec 2029 | In study |
| Jackrabbit Flats SolarTap 345 kV 1185 Midland County NW - 1018 Moss | Jackrabbit Flats Solar LLC | Solar | 401.3 | Jun 2030 | In study |
Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.
Where are the flood maps for Ector County?
FEMA flood maps for Ector County
How does a project here connect to the grid?
Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.
Interconnection by market and utilityERCOT resource integration
What state and federal reviews can apply?
Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.
Statewide and federal contactsTexas decommissioning law
Check a specific property in Ector County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.