Home › Texas permits › Crane County
Crane County, Texas: solar, wind, and storage permits
Who to call and what to check for a solar, wind, or battery storage project in Crane County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.
Who handles property records and taxes in Crane County?
The Crane County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.
Crane County directory (Texas Comptroller)Lease rates and rollback taxes
Which TCEQ office covers Crane County?
TCEQ Region 7, Midland
10 Desta Dr, Ste 350E, Midland TX 79705-4530
Main line: 432-570-1359 · Spills, 24 hours: 800-832-8224
Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.
TCEQ region directoryConstruction stormwater permit
Does Crane County have zoning or a solar permit?
Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.
What energy projects are proposed in Crane County?
ERCOT's August 2026 interconnection report lists 13 proposed energy projects in Crane County (5 solar and 8 battery storage), about 2,944 MW in all. 4 of the 13 have a signed interconnection agreement, and 1 has been energized or approved to connect.
Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.
Scroll the table sideways to see every column.
| Project and connection point | Developer | Type | MW | Projected in service | Stage |
|---|---|---|---|---|---|
| Soda Lake BESS 1138kV Soda Lake Substation (#76026) | Mendoza Trail BESS, LLC | Battery storage (paired with solar) | 203.9 | Aug 2026 | Approved to connect |
| Soda Lake Solar 2 SLF138 kV Soda Lake (#76026) | Crane II Solar Electric, LLC | Solar | 201.7 | Oct 2028 | Signed Mar 2022 |
| Tri-X Solar 1 SLF138 kV Soda Lake (#76026) | Crane I Solar Electric, LLC | Solar | 201.5 | Oct 2028 | Signed Feb 2022 |
| Cattle Drive Solar76000 North McCamey 345kV | Cattle Drive Solar, LLC | Solar | 307.0 | Mar 2029 | Signed Dec 2025 |
| BRP Pictor BESS60400 Lynx 138kV | BRP Pictor BESS LLC | Battery storage (stand-alone) | 201.1 | Nov 2025 | In study |
| Fowler Ranch Storage76025 Castle Mountain 138kV | Crane BESS, LLC | Battery storage (stand-alone) | 26.1 | Jun 2027 | In study |
| BRP Ampato BESS10002 NS Crane Switch 138kV | BRP Ampato BESS LLC | Battery storage (stand-alone) | 121.6 | Dec 2027 | In study |
| Soda Lake BESS 2 SLF138 kV Soda Lake (#76026) | Crane II Solar Electric, LLC | Battery storage (paired with solar) | 205.3 | Oct 2028 | In study |
| Tri-X BESS 1 SLF138 kV Soda Lake (#76026) | Crane I Solar Electric, LLC | Battery storage (paired with solar) | 205.3 | Oct 2028 | In study |
| Western Flats SolarTap 138 kV 76615 Crane -76635 King Mountain; POI is 7.85 miles from... | Hecate Energy Point Mountain Solar Facility 1 LLC | Solar | 410.2 | Nov 2028 | In study |
| Western Flats StorageTap 138 kV 76615 Crane -76635 King Mountain | Hecate Energy Point Mountain Solar Facility 1 LLC | Battery storage (paired with solar) | 410.7 | Nov 2028 | In study |
| Tierra Loma SolarTap 345 kV #18668 ROCK DRAW - #76000 NORTH MCCAMEY ckt 1 | Tierra Loma Solar, LLC | Solar | 250.0 | Sep 2029 | In study |
| Tierra Loma StorageTap 345 kV #18668 ROCK DRAW - #76000 NORTH MCCAMEY ckt 1 | Tierra Loma Solar, LLC | Battery storage (paired with solar) | 200.0 | Sep 2029 | In study |
Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.
Where are the flood maps for Crane County?
FEMA flood maps for Crane County
How does a project here connect to the grid?
Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.
Interconnection by market and utilityERCOT resource integration
What state and federal reviews can apply?
Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.
Statewide and federal contactsTexas decommissioning law
Check a specific property in Crane County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 7
Andrews · Borden · Dawson · Ector · Gaines · Glasscock · Howard · Loving · Martin · Midland · Pecos · Reeves · Terrell · Upton · Ward · Winkler