Contacts checked 2026-09-26 · From official state and federal directories

Who to call and what to check for a solar, wind, or battery storage project in Lamar County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Lamar County?

The Lamar County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Lamar County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Lamar County?

TCEQ Region 5, Tyler
2916 Teague Dr, Tyler TX 75701-3734
Main line: 903-535-5100 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Lamar County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Lamar County?

ERCOT's August 2026 interconnection report lists 24 proposed energy projects in Lamar County (13 solar, 1 wind, 7 battery storage and 3 gas), about 6,054 MW in all. 13 of the 24 have a signed interconnection agreement, and 8 have been energized or approved to connect.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
MRG GOODY SOLARTap 138 kV Toco Switch (#1700) – Paris Switch (#1693)MRG GOODY SOLAR PROJECT, LLCSolar170.8Aug 2026Approved to connect
MRG Goody StorageTap 138 kV Toco Switch (#1700) – Paris Switch (#1693)MRG Goody Solar Project LLCBattery storage52.3Aug 2026Approved to connect
Baker Branch Solartap 345kV 1692 Paris - 1690 ValleyMockingbird Solar Center, LLCSolar469.4Sep 2026Approved to connect
Delilah Solar 1tap both 345kV 1685 FarmersVl - 1695 Moses cktsDelilah Solar Energy LLCSolar300.0Dec 2026Approved to connect
Delilah Solar 2345 kV TTRSW 11688Delilah Solar Energy II LLCSolar317.6Dec 2026Approved to connect
Samson Solar 1tap both 345kV 1685 FarmersVl - 1695 Moses cktsSamson Solar Energy LLCSolar250.0Dec 2026Approved to connect
Samson Solar 2345 kV TTRSW 11688Samson Solar Energy II LLCSolar203.0Dec 2026Approved to connect
Samson Solar 3tap both 345kV 1685 FarmersVl - 1695 Moses cktsSamson Solar Energy III LLCSolar250.0Dec 2026Approved to connect
Rowdy Creek SolarWoodfin Switch (#1465) 345kVRowdy Creek Solar LLCSolar351.8Dec 2027Signed; security posted
Echols Grove SolarTap 138kV Hawk Hollow Switch (#11768) and Lamar Blossom Switch (#11...Echols Grove, LLCSolar201.6Jan 2028Signed; security posted
Star Dairy SolarTap 345kV 1692 PARIS_SW1_5 -- 11699 WOODARD_5Star Dairy Solar LLCSolar115.6Jul 2027Signed Dec 2024
Star Dairy StorageTap 345kV 1692 PARIS_SW1_5 -- 11699 WOODARD_5Star Dairy StorageBattery storage (paired with solar)205.2Jul 2027Signed Dec 2024
Bug Tussle Wind ProjectTap 1729 Valley South and 1692 ParisBug Tussle Wind, LLCWind396.8Sep 2028Signed Jul 2024
Lamar Unit 1 Repower1692 Paris Switch Station 345kVLa Frontera Holdings, LLCGas combined cycle66.0Dec 2027In study
Arc Energy StorageTap 138kV 1693 Paris Switch - 11806 ENLOE T8Paris Energy Storage, LLCBattery storage (stand-alone)204.5Jun 2028In study
Roxton SolarTap 138 KV Bois Pump (1835) - Brookston (1833)Roxton Solar, LLCSolar116.8Jul 2028In study
Roxton StorageTap 138 KV Bois Pump (1835) - Brookston (1833)Roxton Solar, LLCBattery storage (paired with solar)102.0Jul 2028In study
Lan Battery SLFTap 345kV 1729 Valley South – 1692 Paris SwitchBR Solar, LLCBattery storage (paired with solar)Self-limitingAug 2028In study
Lan Solar SLFTap 345kV 1729 Valley South – 1692 Paris SwitchBR Solar, LLCSolar182.2Aug 2028In study
Mud Cat Solar SLFTap 138KV 11768 Hawk Hollow – 1768 DeportMud Cat Solar, LLCSolar100.5Sep 2028In study
Mud Cat Storage SLF11768 Hawk Hollow – 1768 Deport 138kVMud Cat Solar, LLCBattery storage (paired with solar)Self-limitingSep 2028In study
Baker Branch BESSPacific Switch (PACSW) 345 kV Bus 11683Mockingbird Storage Center, LLCBattery storage (paired with solar)287.2Dec 2029In study
Southeast Oklahoma Pumped Storage1692 Paris Switch 345kVApex Energy Solutions, LLCWAT1,232.0Jan 2030In study
North Royal Thermal (TEF- Due Diligence)Tap 345kV 1695 MOSES_5 - 11699 WOODARD_5Invenergy Energy Transition Development LLCGas turbine479.0Aug 2030In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Lamar County?

FEMA flood maps for Lamar County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Lamar County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 5

Anderson · Bowie · Camp · Cass · Cherokee · Delta · Franklin · Gregg · Harrison · Henderson · Hopkins · Marion · Morris · Panola · Rains · Red River · Rusk · Smith · Titus · Upshur · Van Zandt · Wood

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.