Quicksand Check

Home › Texas permits › Anderson County

Anderson County, Texas: solar, wind, and storage permits

Contacts checked 2026-09-26 · From official state and federal directories

Who to call and what to check for a solar, wind, or battery storage project in Anderson County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Anderson County?

The Anderson County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Anderson County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Anderson County?

TCEQ Region 5, Tyler
2916 Teague Dr, Tyler TX 75701-3734
Main line: 903-535-5100 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Anderson County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Anderson County?

ERCOT's August 2026 interconnection report lists 9 proposed energy projects in Anderson County (2 solar, 4 battery storage and 3 gas), about 4,645 MW in all. 3 of the 9 have a signed interconnection agreement.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
Brotherton Storage6937 Tucker Sub 138kVBT Brotherton Storage, LLCBattery storage (stand-alone)176.1May 2027Signed; security posted
Pham BESSTap 138kV 3281 TENNCLNY_8 - 3499 BLACKFTAP_8ASB1, LLCBattery storage (stand-alone)133.0Sep 2028Signed; security posted
Skull Creek SolarTap 138kV 3281 Tennessee Colony - 3499 BlackfootSkull Creek Solar, LLCSolar137.0Jul 2027Signed May 2024
ALWEST BESS3114 Paltalco 138kVCastleman PowerBattery storage (stand-alone)208.6Apr 2028In study
Lumen Farm BESS SLFTap 138kV 3325 Blackburn Switch – 3272 PalestineNeches Solar, LLCBattery storage (paired with solar)Self-limitingSep 2028In study
Lumen Farm Solar SLFTap 138kV 3325 Blackburn Switch – 3272 PalestineNeches Solar, LLCSolar201.0Sep 2028In study
Mule Deer Run Gas#3308 Pin Oak 345KVAnderson Energy Center, LLCGas combined cycle1,263.0Jul 2031In study
Mule Deer Run Gas II#3308 Pin Oak 345KVAnderson Energy Center, LLCGas combined cycle1,263.0Jul 2032In study
Mule Deer Run Gas III#3308 Pin Oak 345KVAnderson Energy Center, LLCGas combined cycle1,263.0Jul 2032In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Anderson County?

FEMA flood maps for Anderson County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Anderson County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 5

Bowie · Camp · Cass · Cherokee · Delta · Franklin · Gregg · Harrison · Henderson · Hopkins · Lamar · Marion · Morris · Panola · Rains · Red River · Rusk · Smith · Titus · Upshur · Van Zandt · Wood

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.