Quicksand Check

Home › Texas permits › Hopkins County

Hopkins County, Texas: solar, wind, and storage permits

Contacts checked 2026-09-26 · From official state and federal directories

Who to call and what to check for a solar, wind, or battery storage project in Hopkins County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Hopkins County?

The Hopkins County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Hopkins County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Hopkins County?

TCEQ Region 5, Tyler
2916 Teague Dr, Tyler TX 75701-3734
Main line: 903-535-5100 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Hopkins County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Hopkins County?

ERCOT's August 2026 interconnection report lists 13 proposed energy projects in Hopkins County (8 solar and 5 battery storage), about 2,219 MW in all. 5 of the 13 have a signed interconnection agreement, and 2 have been energized or approved to connect.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
Pine Forest SolarMonticello Switch – Allen Switch 345 kV LinePine Forest Solar I, LLCSolar301.5Oct 2026Approved to connect
Cartwheel BESS 1Tap 345kV 1697 Sulphur Springs Switch – 2464 Cash SwitchCartwheel BESS, LLCBattery storage (stand-alone)154.2Dec 2026Approved to connect
Lucky 7 SolarTap 345kV 2621 Sandy Ranch Switch - 2464 CASH SWITCHLucky 7 Solar Farm LLCSolar101.3Sep 2027Signed; security posted
Cedar Range Solar“Sweet Tea” 345 kV switchyard that taps the Allen Switch – Stouts C...Cedar Range, LLCSolar150.6Sep 2027Signed Jul 2025
Blarney Solar138 kV Ridgeway SwitchBlarney Solar Project LLCSolar81.5Oct 2027Signed Apr 2024
CH Solterra LLCTap 138kV 11796 White Oak POI - 11797 Brinker POICH Solterra LLCSolar143.0May 2027In study
Cartwheel BESS 2Tap 345kV 1697 Sulphur Springs Switch – 2464 Cash SwitchRWE RenewablesBattery storage (stand-alone)156.9Jun 2028In study
Palomino SolarTap 345kV 1695 Monticello - 1697 Sulphur SpringsPalomino RenewablesSolar301.2Dec 2028In study
Dairyland StorageTo 345 kV Birthright Station (#11684)ENGIE IR Holdings LLCBattery storage (stand-alone)301.8Apr 2029In study
Palomino StorageTap 345kV 1695 Monticello - 1697 Sulphur SpringsPalomino RenewablesBattery storage (paired with solar)155.1May 2029In study
JUNIPERUS BESSTAP CASHSW_T5 (2464) -SULSP_SS1_5 (1697)BLUE STONE RENEWABLE XXI LLCBattery storage (paired with solar)169.6Jul 2029In study
JUNIPERUSSSTAP CASHSW_T5 (2464) -SULSP_SS1_5 (1697)BLUE STONE RENEWABLE XXI LLCSolar80.3Jul 2029In study
Project Alpha Solar138 kV COOPER LAKE PUMP TAP bus# 1822 ---- 138 KV #1814 SULPHUR SPR...SGE Alpha Energy LLCSolar122.0Sep 2029In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Hopkins County?

FEMA flood maps for Hopkins County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Hopkins County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 5

Anderson · Bowie · Camp · Cass · Cherokee · Delta · Franklin · Gregg · Harrison · Henderson · Lamar · Marion · Morris · Panola · Rains · Red River · Rusk · Smith · Titus · Upshur · Van Zandt · Wood

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.