Home › Texas permits › Hopkins County
Hopkins County, Texas: solar, wind, and storage permits
Who to call and what to check for a solar, wind, or battery storage project in Hopkins County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.
Who handles property records and taxes in Hopkins County?
The Hopkins County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.
Hopkins County directory (Texas Comptroller)Lease rates and rollback taxes
Which TCEQ office covers Hopkins County?
TCEQ Region 5, Tyler
2916 Teague Dr, Tyler TX 75701-3734
Main line: 903-535-5100 · Spills, 24 hours: 800-832-8224
Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.
TCEQ region directoryConstruction stormwater permit
Does Hopkins County have zoning or a solar permit?
Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.
What energy projects are proposed in Hopkins County?
ERCOT's August 2026 interconnection report lists 13 proposed energy projects in Hopkins County (8 solar and 5 battery storage), about 2,219 MW in all. 5 of the 13 have a signed interconnection agreement, and 2 have been energized or approved to connect.
Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.
Scroll the table sideways to see every column.
| Project and connection point | Developer | Type | MW | Projected in service | Stage |
|---|---|---|---|---|---|
| Pine Forest SolarMonticello Switch – Allen Switch 345 kV Line | Pine Forest Solar I, LLC | Solar | 301.5 | Oct 2026 | Approved to connect |
| Cartwheel BESS 1Tap 345kV 1697 Sulphur Springs Switch – 2464 Cash Switch | Cartwheel BESS, LLC | Battery storage (stand-alone) | 154.2 | Dec 2026 | Approved to connect |
| Lucky 7 SolarTap 345kV 2621 Sandy Ranch Switch - 2464 CASH SWITCH | Lucky 7 Solar Farm LLC | Solar | 101.3 | Sep 2027 | Signed; security posted |
| Cedar Range Solar“Sweet Tea” 345 kV switchyard that taps the Allen Switch – Stouts C... | Cedar Range, LLC | Solar | 150.6 | Sep 2027 | Signed Jul 2025 |
| Blarney Solar138 kV Ridgeway Switch | Blarney Solar Project LLC | Solar | 81.5 | Oct 2027 | Signed Apr 2024 |
| CH Solterra LLCTap 138kV 11796 White Oak POI - 11797 Brinker POI | CH Solterra LLC | Solar | 143.0 | May 2027 | In study |
| Cartwheel BESS 2Tap 345kV 1697 Sulphur Springs Switch – 2464 Cash Switch | RWE Renewables | Battery storage (stand-alone) | 156.9 | Jun 2028 | In study |
| Palomino SolarTap 345kV 1695 Monticello - 1697 Sulphur Springs | Palomino Renewables | Solar | 301.2 | Dec 2028 | In study |
| Dairyland StorageTo 345 kV Birthright Station (#11684) | ENGIE IR Holdings LLC | Battery storage (stand-alone) | 301.8 | Apr 2029 | In study |
| Palomino StorageTap 345kV 1695 Monticello - 1697 Sulphur Springs | Palomino Renewables | Battery storage (paired with solar) | 155.1 | May 2029 | In study |
| JUNIPERUS BESSTAP CASHSW_T5 (2464) -SULSP_SS1_5 (1697) | BLUE STONE RENEWABLE XXI LLC | Battery storage (paired with solar) | 169.6 | Jul 2029 | In study |
| JUNIPERUSSSTAP CASHSW_T5 (2464) -SULSP_SS1_5 (1697) | BLUE STONE RENEWABLE XXI LLC | Solar | 80.3 | Jul 2029 | In study |
| Project Alpha Solar138 kV COOPER LAKE PUMP TAP bus# 1822 ---- 138 KV #1814 SULPHUR SPR... | SGE Alpha Energy LLC | Solar | 122.0 | Sep 2029 | In study |
Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.
Where are the flood maps for Hopkins County?
FEMA flood maps for Hopkins County
How does a project here connect to the grid?
Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.
Interconnection by market and utilityERCOT resource integration
What state and federal reviews can apply?
Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.
Statewide and federal contactsTexas decommissioning law
Check a specific property in Hopkins County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 5
Anderson · Bowie · Camp · Cass · Cherokee · Delta · Franklin · Gregg · Harrison · Henderson · Lamar · Marion · Morris · Panola · Rains · Red River · Rusk · Smith · Titus · Upshur · Van Zandt · Wood