Webb County, Texas: solar, wind, and storage permits
Who to call and what to check for a solar, wind, or battery storage project in Webb County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.
Who handles property records and taxes in Webb County?
The Webb County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.
Webb County directory (Texas Comptroller)Lease rates and rollback taxes
Which TCEQ office covers Webb County?
TCEQ Region 16, Laredo
707 E Calton Rd, Ste 304, Laredo TX 78041-3887
Main line: 956-791-6611 · Spills, 24 hours: 800-832-8224
Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.
TCEQ region directoryConstruction stormwater permit
Does Webb County have zoning or a solar permit?
Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.
What energy projects are proposed in Webb County?
ERCOT's August 2026 interconnection report lists 19 proposed energy projects in Webb County (7 solar, 2 wind and 10 battery storage), about 4,271 MW in all. 5 of the 19 have a signed interconnection agreement, and 1 has been energized or approved to connect.
Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.
Scroll the table sideways to see every column.
| Project and connection point | Developer | Type | MW | Projected in service | Stage |
|---|---|---|---|---|---|
| Torrecillas BESS161257 Torrecillas 345kV | Torrecillas Interconnect, LLC | Battery storage (stand-alone) | 9.9 | Dec 2026 | Approved to connect |
| Corvus SolarTap 345kV Cenzio (#80219) - Lobo (#80220) | Corvus Solar, LLC | Solar | 201.5 | Nov 2028 | Signed; security posted |
| Cuchillas Solar80219 Lobo 345kV | Gransolar Texas Two, LLC | Solar | 305.6 | Dec 2028 | Signed; security posted |
| Siete345kV 8718 Triada | Apex Clean Energy | Wind | 492.8 | Mar 2029 | Signed; security posted |
| Corazon Solar Phase II80219 Lobo 345kV | BAYWA R.E. SOLAR PROJECTS | Solar | 203.9 | Jun 2028 | Signed Aug 2020 |
| Becerra Creek Storage 1345 kV Cenizo Substation (#80220) | Bordas Renewable Energy, LLC | Battery storage (stand-alone) | 125.6 | Dec 2027 | In study |
| Becerra Creek Storage 2345 kV Cenizo Substation (#80220) | Bordas Renewable Energy, LLC | Battery storage (stand-alone) | 125.6 | Dec 2027 | In study |
| Bravo BESSTap 345kV 80220 CENIZO7A - 80224 TIEMPO7A | Bravo BESS LLC | Battery storage (stand-alone) | 207.4 | Dec 2027 | In study |
| Siete Wind345kV 8718 Triada | Siete Wind, LLC | Wind | 492.8 | Jan 2028 | In study |
| Outpost Storage345kv Avanzada7A (80235) | Hecate Energy Outpost Storage LLC | Battery storage (paired with solar) | 508.1 | Mar 2028 | In study |
| Diamond Sage BESS 1tap 345kV 80219 LOBO7A - 5709 FOWLERTONSW5 CKT2 | DGC Renewables, LLC | Battery storage (paired with solar) | 103.5 | Oct 2028 | In study |
| Diamond Sage BESS 2Tap 345kV LOBO7A (80219) - FOWLERTONSW5 (5709) | DGC Renewables, LLC | Battery storage (paired with solar) | 103.5 | Oct 2028 | In study |
| Diamond Sage Solar 1tap 345kV 80219 LOBO7A - 5709 FOWLER | DGC Renewables, LLC | Solar | 214.0 | Oct 2028 | In study |
| Diamond Sage Solar 2Tap 345kV LOBO7A (80219) - FOWLERTONSW5 (5709) | DGC Renewables, LLC | Solar | 214.0 | Oct 2028 | In study |
| Cuchillas BESS80219 Lobo 345kV | Gransolar Texas Two | Battery storage (paired with solar) | 306.9 | Dec 2028 | In study |
| Pradera Storagetap 345 kV Lobo 80219 - Fowlerton 5709 ckt #2 | Pradera Storage, LLC | Battery storage (stand-alone) | 153.1 | Jun 2029 | In study |
| El Molino Solar SLFTap 138kV 80439 LaQuinta - 8297 Bruni 8297 | El Molino Solar, LLC | Solar | 201.3 | Sep 2029 | In study |
| El Molino Storage SLFTap 138kV 80439 LaQuinta - 8297 Bruni 8297 | El Molino Solar, LLC | Battery storage (paired with solar) | Self-limiting | Sep 2029 | In study |
| Cenizo SolarTap 345 kV 80220 Cenizo - 80079 Cruce Ckt 2 | Cenizo Energy Center LLC | Solar | 301.4 | Dec 2029 | In study |
Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.
Where are the flood maps for Webb County?
FEMA flood maps for Webb County
How does a project here connect to the grid?
Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.
Interconnection by market and utilityERCOT resource integration
What state and federal reviews can apply?
Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.
Statewide and federal contactsTexas decommissioning law
Check a specific property in Webb County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 16
Dimmit · Duval · Kinney · La Salle · Maverick · McMullen · Val Verde · Zapata · Zavala