Who to call and what to check for a solar, wind, or battery storage project in Starr County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.
Who handles property records and taxes in Starr County?
The Starr County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.
Starr County directory (Texas Comptroller)Lease rates and rollback taxes
Which TCEQ office covers Starr County?
TCEQ Region 15, Harlingen
1804 W Jefferson Ave, Harlingen TX 78550-5247
Main line: 956-425-6010 · Spills, 24 hours: 800-832-8224
Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.
TCEQ region directoryConstruction stormwater permit
Does Starr County have zoning or a solar permit?
Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.
What energy projects are proposed in Starr County?
ERCOT's August 2026 interconnection report lists 20 proposed energy projects in Starr County (7 solar, 4 wind and 9 battery storage), about 4,265 MW in all. 8 of the 20 have a signed interconnection agreement, and 2 have been energized or approved to connect.
Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.
Scroll the table sideways to see every column.
| Project and connection point | Developer | Type | MW | Projected in service | Stage |
|---|---|---|---|---|---|
| Starr Solar Ranch8795 Roma 138kV | Starr Solar Ranch 1 LLC | Solar | 136.7 | Aug 2025 | Approved to connect |
| Mesteno Wind80355 Del Sol 345kV | Mesteno Windpower, LLC | Wind | 201.6 | Mar 2027 | Approved to connect |
| Diamondback solar80355 Del Sol 345kV | Diamondback Solar, LLC | Solar | 203.8 | May 2028 | Signed; security posted |
| Bullring Wind 1Tap 345 kV 80355 DelSol7A - 80079 Cruce Ckt 1 | Halcon Wind, LLC | Wind | 303.5 | Jun 2028 | Signed; security posted |
| Bullring Wind 2Tap 345 kV 80355 DelSol7A - 80079 Cruce Ckt 1 | Halcon Wind, LLC | Wind | 303.8 | Jun 2028 | Signed; security posted |
| Bullring Wind 3Tap 345 kV 80355 DelSol7A - 80079 Cruce Ckt 1 | Halcon Wind, LLC | Wind | 190.4 | Jun 2028 | Signed; security posted |
| Bordertown BESS8796 Roma 138kV | Bordertown BESS LLC | Battery storage (stand-alone) | 100.0 | Dec 2028 | Signed; security posted |
| Half Moon Solar#80231 Pronto 345kV | NextEra Energy Interconnection Holdings, LLC | Solar | 512.5 | Jul 2029 | Signed; security posted |
| Starr Storage8795 Roma 138kV | Falcon Lake Storage, LLC | Battery storage (paired with solar) | Self-limiting | Mar 2028 | In study |
| Halcon StorageTap 138kV 8957 Central Lopeno - 80106 Falcon Dam | TX BESS A LLC | Battery storage (stand-alone) | 132.7 | May 2028 | In study |
| PSE Flores TX StorageTAP 138KV 8793 RIO GRANDE CITY - 8798 LAGRULLA | PureSky Development Inc | Battery storage (stand-alone) | 200.0 | Jun 2028 | In study |
| PSE Gongora Hill TX StorageTap 138kV 8796 Roma – 7870 Escobares | PureSky Development Inc | Battery storage (stand-alone) | 200.0 | Jun 2028 | In study |
| Fierce River BESSTapping the 345 kV Line from Del Sol (Bus# 80355) to Frontera (Bus#... | Rio Grande Solar LLC | Battery storage (stand-alone) | 284.5 | Feb 2029 | In study |
| Sword BESSTap 138 kV 8394 Liston - 8392 Bates | Hidalgo Solar LLC | Battery storage (paired with solar) | 40.1 | Feb 2029 | In study |
| Sword SolarTap 138 kV 8394 Liston - 8392 Bates | Hidalgo Solar LLC | Solar | 137.2 | Feb 2029 | In study |
| Muy Grande SolarTap 345kV 80079 Cruce - 80355 Del Sol | ACE DevCo NC, LLC | Solar | 502.7 | May 2029 | In study |
| Mandolin Solar II SLFTap 345kV 80355 Del Sol - 80227 Rapido | Mandolin Energy Center II, LLC | Solar | 304.4 | Jun 2029 | In study |
| Mandolin Solar SLFTap 345kV 80355 Del Sol - 80227 Rapido | Mandolin Energy Center I, LLC | Solar | 300.0 | Jun 2029 | In study |
| Mandolin Storage SLFTap 345kV 80355 Del Sol - 80227 Rapido | Mandolin Energy Center I, LLC | Battery storage (paired with solar) | Self-limiting | Jun 2029 | In study |
| Bessie StorageCharly Egner Substation Tap 345kV 80355 Del Sol - 80368 LV4 Bridge | Bessie Energy Storage, LLC | Battery storage (stand-alone) | 210.8 | Sep 2029 | In study |
Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.
Where are the flood maps for Starr County?
FEMA flood maps for Starr County
How does a project here connect to the grid?
Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.
Interconnection by market and utilityERCOT resource integration
What state and federal reviews can apply?
Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.
Statewide and federal contactsTexas decommissioning law
Check a specific property in Starr County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 15
Brooks · Cameron · Hidalgo · Jim Hogg · Kenedy · Willacy