San Patricio County, Texas: solar, wind, and storage permits
Who to call and what to check for a solar, wind, or battery storage project in San Patricio County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.
Who handles property records and taxes in San Patricio County?
The San Patricio County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.
San Patricio County directory (Texas Comptroller)Lease rates and rollback taxes
Which TCEQ office covers San Patricio County?
TCEQ Region 14, Corpus Christi
500 North Shoreline Blvd, Ste 500, Corpus Christi TX 78401-0318
Main line: 361-881-6900 · Spills, 24 hours: 800-832-8224
Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.
TCEQ region directoryConstruction stormwater permit
Does San Patricio County have zoning or a solar permit?
Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.
What energy projects are proposed in San Patricio County?
ERCOT's August 2026 interconnection report lists 27 proposed energy projects in San Patricio County (9 solar, 2 wind, 14 battery storage and 2 gas), about 6,856 MW in all. 11 of the 27 have a signed interconnection agreement, and 2 have been energized or approved to connect.
Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.
Scroll the table sideways to see every column.
| Project and connection point | Developer | Type | MW | Projected in service | Stage |
|---|---|---|---|---|---|
| Jackalope Solar8173 Gibbs 138kV | Peacock Energy Project, LLC | Solar | 155.7 | Feb 2026 | Approved to connect |
| Pintail Pass BESS8249 ANGSTROM 345KV | Pintail Pass BESS, LLC | Battery storage (stand-alone) | 207.2 | Aug 2026 | Approved to connect |
| SanPat Solar ITap 345kV 8249 Angstrom – 8659 Naismith | Padre Solar LLC | Solar | 308.9 | Jul 2027 | Signed; security posted |
| SanPat Solar IITap 345kV 8249 Angstrom – 8659 Naismith | CGRP 04, LLC | Solar | 256.2 | Jul 2027 | Signed; security posted |
| Bowstring BESS138kV 8961 WHITEPT4A - 8418 RINCON4A | Longbow Energy Storage, LLC | Battery storage (stand-alone) | 155.0 | Sep 2028 | Signed; security posted |
| Bayou Creek Solar8606 Goddard 345kV | Bayou Creek Solar LLC | Solar | 255.5 | Sep 2028 | Signed; security posted |
| Diamond Cowboy StorageTap 345kV 8249 Angstrom - 8624 Grissom | Diamond B Storage, LLC | Battery storage (stand-alone) | 103.5 | Oct 2028 | Signed; security posted |
| Titus Low Carbon Ventures Solar 1Tap 345kV 8249 Angstrom - 8624 Grissom | Vaquero Solar, LLC | Solar | 338.0 | Oct 2028 | Signed May 2026 |
| Iron Cowboy SolarBus #8920 Haisley 4A 138 kV | Vaquero II Solar LLC | Solar | 144.6 | Dec 2028 | Signed Aug 2026 |
| Iron Cowboy StorageBus #8920 Haisley 4A 138 kV | Vaquero II Storage LLC | Battery storage (paired with solar) | 63.3 | Dec 2028 | Signed Aug 2026 |
| Palo Verde WindTap 345kV 8624 Grissom – 8455 Lon C Hill | RWE Clean Energy Development, LLC | Wind | 297.5 | Jul 2029 | Signed Dec 2025 |
| Portland Storage SLF8566 HOT IRON 4A 138 kV | Convergent Energy Solutions LLC | Battery storage (stand-alone) | Self-limiting | Jan 2028 | In study |
| Coda BESS(#80258) Mayo 138kV | Coda BESS, LLC | Battery storage (stand-alone) | 202.0 | Jul 2028 | In study |
| Gregory Power Development SLF8580 Resnick 138kV | Gregory Power Partners LLC | Gas combined cycle | 469.9 | Dec 2028 | In study |
| Alila BESS II8249 Angstrom 345kV | Electra Energy Project, LLC | Battery storage (stand-alone) | 205.7 | Jan 2029 | In study |
| Sunburst BESSKATOEN (Bus#8579) | Indigo Solar, LLC | Battery storage (paired with solar) | 256.3 | Mar 2029 | In study |
| Sunburst SolarKATOEN (Bus#8579) | Indigo Solar, LLC | Solar | 301.6 | Mar 2029 | In study |
| San Patricio Energy Center BESS8606 Goddard 345kV | Ferrovial Energy US 1 | Battery storage (stand-alone) | 300.8 | Mar 2029 | In study |
| Kalina Solar8606 Goddard 345kV | Aurora Solar LLC | Solar | 120.0 | May 2029 | In study |
| PALO VERDE BESSTap 345kV 8624 Grissom – 8455 Lon C Hill | RWE Clean Energy Development, LLC | Battery storage (paired with wind) | 150.0 | Jul 2029 | In study |
| Gulf Gateway Solar OneTap 345 kV 8249 Angstrom - 8624 Grissom | Gulf Gateway Solar, LLC | Solar | 301.4 | Dec 2029 | In study |
| Gulf Gateway Storage OneTap 345 kV 8249 Angstrom - 8624 Grissom | Gulf Gateway Storage, LLC | Battery storage (paired with solar) | 301.4 | Dec 2029 | In study |
| Kalina Storage8606 GODDARD 345kV | Aurora Solar LLC | Battery storage (paired with solar) | 104.6 | Dec 2029 | In study |
| Pathfinder Energy Storage, LLC8437 Rincon 138kV | Pathfinder Energy Storage, LLC | Battery storage (stand-alone) | 201.2 | Dec 2029 | In study |
| Nautilus Heavy Storage8422 Dupont 138kV | Nautilus Heavy Storage, LLC | Battery storage (stand-alone) | 256.2 | Jan 2030 | In study |
| Hecate Energy Arkansas Wind8659 Naismith 345kV | Hecate Energy Gulf Wind LLC | Wind | 1,029.4 | Jun 2030 | In study |
| Blue Kite<Bus#8956> <WHITEPOINT> <345KV> | RWE Clean Energy Development, LLC | Gas turbine | 370.1 | Aug 2030 | In study |
Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.
Where are the flood maps for San Patricio County?
FEMA flood maps for San Patricio County
How does a project here connect to the grid?
Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.
Interconnection by market and utilityERCOT resource integration
What state and federal reviews can apply?
Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.
Statewide and federal contactsTexas decommissioning law
Check a specific property in San Patricio County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 14
Aransas · Bee · Calhoun · DeWitt · Goliad · Gonzales · Jackson · Jim Wells · Kleberg · Lavaca · Live Oak · Nueces · Refugio · Victoria