Who handles property records and taxes in Goliad County?
The Goliad County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.
Goliad County directory (Texas Comptroller)Lease rates and rollback taxes
Which TCEQ office covers Goliad County?
TCEQ Region 14, Corpus Christi
500 North Shoreline Blvd, Ste 500, Corpus Christi TX 78401-0318
Main line: 361-881-6900 · Spills, 24 hours: 800-832-8224
Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.
TCEQ region directoryConstruction stormwater permit
Does Goliad County have zoning or a solar permit?
Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.
What energy projects are proposed in Goliad County?
ERCOT's August 2026 interconnection report lists 14 proposed energy projects in Goliad County (6 solar, 7 battery storage and 1 gas), about 2,666 MW in all. 5 of the 14 have a signed interconnection agreement, and 1 has been energized or approved to connect.
Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.
Scroll the table sideways to see every column.
| Project and connection point | Developer | Type | MW | Projected in service | Stage |
|---|---|---|---|---|---|
| Tulsita SolarTap 138kV 8590 Tuleta - 8595 Euler | Ray Ranch Solar LLC | Solar | 256.2 | Sep 2026 | Approved to connect |
| KEYS HOLLOW SOLAR SLFTAP 345 KV LINE FROM COLETO 8164 - RAPTOR7A 8673 | Keys Hollow Solar, LLC | Solar | 200.8 | Mar 2028 | Signed; security posted |
| KEYS HOLLOW STORAGE SLFTAP 345 KV LINE FROM COLETO 8164 - RAPTOR7A 8673 | Keys Hollow Solar, LLC | Battery storage (paired with solar) | Self-limiting | Mar 2028 | Signed; security posted |
| Keys Hollow Solar Phase II SLF345kV Tap 8164 Coleto Creek - 8673 RAPTOR7A | Keys Hollow Solar, LLC | Solar | 200.8 | Mar 2028 | Signed; security posted |
| Keys Hollow Storage Phase II SLF345kV Tap 8164 Coleto Creek - 8673 RAPTOR7A | Keys Hollow Solar, LLC | Battery storage (paired with solar) | Self-limiting | Mar 2028 | Signed; security posted |
| Coleto Creek - Fuel Change Only8162 Coleto Creek 138kV | COLETO CREEK POWER LLC | Gas steam turbine | 655.0 | Dec 2026 | In study |
| PEREGRINE BESStap 345kV 8624 Grissom - 8164 Coleto Creek | CED Development Inc. | Battery storage (paired with solar) | 150.0 | Jul 2027 | In study |
| Peregrine BESS 28673 RAPTOR7A 345kV | CED Development Inc. | Battery storage (paired with solar) | 150.0 | Jul 2027 | In study |
| Double A Solar SLFTap 69kV 5678 Schroeder - 5675 Big Oak | Double A Solar, LLC | Solar | 132.6 | May 2028 | In study |
| Double A Storage SLFTap 69kV 5678 Schroeder - 5675 Big Oak | Double A Storage, LLC | Battery storage (paired with solar) | Self-limiting | May 2028 | In study |
| Kuy Creek Solar 1 SLFTap Coleto Creek (Bus # 8162) - Victoria (Bus# 8172) 138 kV CKT 1 | Kuy Creek Solar 1 LLC | Solar | 234.9 | Mar 2029 | In study |
| Kuy Creek Storage 1 SLFTap - Coleto Creek (Bus # 8162) - Victoria (Bus# 8172) 138 kV CKT 1 | Kuy Creek Storage 1 LLC | Battery storage (paired with solar) | 151.5 | Mar 2029 | In study |
| Angel City SolarColeto Creek (# 8164) AEP – Pawnee (#5725) STEC, 25.9 miles from Co... | Angel City Energy Center, LLC | Solar | 221.0 | Sep 2029 | In study |
| Diablo Campo StorageThe Coleto Greek (#8164) to Pawnee Switching Station (#5725) ; LCRA | Diablo Campo Energy Center, LLC | Battery storage (stand-alone) | 313.5 | Sep 2029 | In study |
Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.
Where are the flood maps for Goliad County?
FEMA flood maps for Goliad County
How does a project here connect to the grid?
Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.
Interconnection by market and utilityERCOT resource integration
What state and federal reviews can apply?
Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.
Statewide and federal contactsTexas decommissioning law
Check a specific property in Goliad County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 14
Aransas · Bee · Calhoun · DeWitt · Gonzales · Jackson · Jim Wells · Kleberg · Lavaca · Live Oak · Nueces · Refugio · San Patricio · Victoria