Home › Texas permits › Tom Green County
Tom Green County, Texas: solar, wind, and storage permits
Who to call and what to check for a solar, wind, or battery storage project in Tom Green County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.
Who handles property records and taxes in Tom Green County?
The Tom Green County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.
Tom Green County directory (Texas Comptroller)Lease rates and rollback taxes
Which TCEQ office covers Tom Green County?
TCEQ Region 8, San Angelo
622 S Oakes, Ste K, San Angelo TX 76903-7035
Main line: 325-655-9479 · Spills, 24 hours: 800-832-8224
Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.
TCEQ region directoryConstruction stormwater permit
Does Tom Green County have zoning or a solar permit?
Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.
What energy projects are proposed in Tom Green County?
ERCOT's August 2026 interconnection report lists 13 proposed energy projects in Tom Green County (5 solar, 2 wind and 6 battery storage), about 3,010 MW in all. 1 of the 13 has a signed interconnection agreement.
Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.
Scroll the table sideways to see every column.
| Project and connection point | Developer | Type | MW | Projected in service | Stage |
|---|---|---|---|---|---|
| Water Valley Wind Energy345 kV 76009 Twin Buttes to 76090 Divide Double Circuit | Water Valley Wind Energy, LLC | Wind | 180.0 | Dec 2027 | Signed; security posted |
| Zeppelin Energy Storage6464 San Angelo North | ZEPPELIN ENERGY STORAGE LLC | Battery storage (stand-alone) | 163.9 | May 2028 | In study |
| Dove Creek SolarTap at Big Hill - Twin Buttes 345 kV line (76003 / 76009) | Dove Creek Solar, LLC | Solar | 163.6 | Jul 2028 | In study |
| Dove Creek StorageTap at Big Hill - Twin Buttes 345 kV line (76003 / 76009) | Dove Creek Solar, LLC | Battery storage (paired with solar) | 162.5 | Jul 2028 | In study |
| Hofbrau BESS6442 Redcreek 138kV | Momentum Hofbrau LLC | Battery storage (stand-alone) | 180.7 | Jul 2028 | In study |
| Moon Chapel WindTap 345kV 76090 Divide - 76009 Twin Buttes Ckt 1 | Orsted Onshore Development North America, LLC | Wind | 379.2 | Oct 2028 | In study |
| Morning Glory Solartap 345kV 7077 Amos Creek - 76009 Twin Buttes | Armadillo Solar, LLC | Solar | 122.4 | Nov 2028 | In study |
| Fort Concho Energy storageTap 138 kV #76320 Schkade - #76011 Twin Buttes Line; LCRA | Rocky Mountain Energy Development, LLC | Battery storage (stand-alone) | 251.2 | Dec 2028 | In study |
| Silver Sky BESS6444 Red Creek 345kV | Lightsource Renewable Energy Development LLC | Battery storage (paired with solar) | 201.1 | Dec 2029 | In study |
| Silver Sky Solar6444 Red Creek 345kV | Lightsource Renewable Energy Development LLC | Solar | 401.9 | Dec 2029 | In study |
| Tango Lily SolarTap 138kV 60008 TRIBUTE4A - 6442 REDCREEK4A | Lightsource Renewable Energy Development LLC | Solar | 200.9 | Dec 2029 | In study |
| Tango Lily BESSTap 138kV 60008 TRIBUTE4A - 6442 REDCREEK4A | Lightsource Renewable Energy Development LLC | Battery storage (paired with solar) | 200.9 | Dec 2029 | In study |
| Moon Chapel SolarTap 345kV 76090 Divide – 76009 Twin Buttes Ckt 1 | Orsted Onshore Development North America, LLC | Solar | 402.0 | Dec 2029 | In study |
Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.
Where are the flood maps for Tom Green County?
FEMA flood maps for Tom Green County
How does a project here connect to the grid?
Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.
Interconnection by market and utilityERCOT resource integration
What state and federal reviews can apply?
Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.
Statewide and federal contactsTexas decommissioning law
Check a specific property in Tom Green County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 8
Coke · Concho · Crockett · Irion · Kimble · Mason · McCulloch · Menard · Reagan · Schleicher · Sterling · Sutton