Contacts checked 2026-09-26 · From official state and federal directories

Who to call and what to check for a solar, wind, or battery storage project in Karnes County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Karnes County?

The Karnes County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Karnes County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Karnes County?

TCEQ Region 13, San Antonio
14250 Judson Rd, San Antonio TX 78233-4480
Main line: 210-490-3096 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Karnes County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Karnes County?

ERCOT's August 2026 interconnection report lists 13 proposed energy projects in Karnes County (6 solar and 7 battery storage), about 1,876 MW in all. None has a signed interconnection agreement yet.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
Tarim BESS5727 Pawnee Switching Substation 138kVBRP Tarim BESS LLCBattery storage (stand-alone)201.0Dec 2027In study
Daystar Solar5728 Choate 138kVChoate Solar, LLCSolar150.0Sep 2028In study
Zunkerville BESS345kV BUS #5725 PAWNEE SWITCHING STATIONZunkerville Energy, LLCBattery storage (paired with solar)206.7Dec 2029In study
Zunkerville Solar#5725 PAWNEE SWITCHING STATION 345kVZunkerville Energy, LLCSolar200.7Dec 2029In study
Charro Creek Solar 1 SLFTap 345kV 5725 PAWNEESW5 - 8164 COLETO7ACharro Creek Solar LLCSolar203.0Dec 2029In study
Charro Creek Solar 2 SLFTap 345kV 5725 PAWNEESW5 - 8164 COLETO7ACharro Creek Solar LLCSolar203.0Dec 2029In study
Charro Creek Solar 3 SLFTap on PAWNEESW5 (#5725) - COLETO7A (#8164) LineCharro Creek Solar LLCSolar203.0Dec 2029In study
Charro Creek Storage 1 SLFTap 345kV 5725 PAWNEESW5 - 8164 COLETO7ACharro Creek Solar LLCBattery storage (paired with solar)Self-limitingDec 2029In study
Charro Creek Storage 2 SLFTap 345kV 5725 PAWNEESW5 - 8164 COLETO7ACharro Creek Solar LLCBattery storage (paired with solar)Self-limitingDec 2029In study
Charro Creek Storage 3 SLFTap 345kV 5725 PAWNEESW5 - 8164 COLETO7ACharro Creek Solar LLCBattery storage (paired with solar)Self-limitingDec 2029In study
White Star Energy StorageMilton Substation 78583 L_MILTON8_1YWhite Star Energy Storage, LLCBattery storage (stand-alone)201.2Dec 2029In study
Coyote Den StorageThe Kenedy Switching Station #2 (#8186) to Rosata POD (#8153) Line...Coyote Den Energy Center, LLCBattery storage (stand-alone)156.9Sep 2030In study
New Shepherd Solarthe Kenedy Switching Station #2 (#8186) – Rosata POD (#8153) line,...New Shepherd Energy Center, LLCSolar150.8Sep 2030In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Karnes County?

FEMA flood maps for Karnes County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Karnes County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 13

Atascosa · Bandera · Bexar · Comal · Edwards · Frio · Gillespie · Guadalupe · Kendall · Kerr · Medina · Real · Uvalde · Wilson

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.