Caldwell County, Texas: solar, wind, and storage permits

Contacts checked 2026-09-26 · From official state and federal directories

Who to call and what to check for a solar, wind, or battery storage project in Caldwell County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Caldwell County?

The Caldwell County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Caldwell County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Caldwell County?

TCEQ Region 11, Austin
12100 Park 35 Circle, Bldg A, Rm 179, Austin TX 78753
Main line: 512-339-2929 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Caldwell County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Caldwell County?

ERCOT's August 2026 interconnection report lists 17 proposed energy projects in Caldwell County (3 solar, 8 battery storage and 6 gas), about 4,719 MW in all. 3 of the 17 have a signed interconnection agreement.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
SCHNEIDER GAS RICEDouble Tap 345kV #7042 Zorn - #7040 Austrop and #7042 Zorn - #9074...LCRAGas engines113.0Dec 2030Signed Dec 2025
SCHNEIDER GAS RICE PHASE 2Double Tap 345kV #7042 Zorn - #7040 Austrop and #7042 Zorn - #9074...LCRAGas engines113.0Dec 2030Signed Dec 2025
SCHNEIDER COMBINED CYCLEDouble Tap 345kV #7042 Zorn - #7040 Austrop and #7042 Zorn - #9074...LCRAGas combined cycle880.0Apr 2032Signed Dec 2025
TAIN SOLARtap 138kV 7216 Lockhart - 7224 Luling CityAbei Energy Green VII LLCSolar37.5Oct 2027In study
Exodus BESSTap 345kV 7040 Austrop – 7042 ZornExodus Solar LLCBattery storage (stand-alone)201.4Dec 2027In study
Volunteer Storage7216 Lockhart 138kVBlackjack Storage LLCBattery storage (stand-alone)50.6Feb 2028In study
Elbus BESS9075 Lytton 138kVBRP Elbus BESS LLCBattery storage (stand-alone)201.0Jun 2028In study
Big Watt Power Austin-1Tapping the 345 kV Double circuit Line: Zorn (Bus# 7042) - Lytton S...Big Watt Power Austin-1 LLCGas combined cycle449.0Nov 2028In study
Lytton Springs BESSLytton Springs (#9074) – Fayette Plant (#7055) 345 kV LineSMT Lytton Springs LLCBattery storage (paired with solar)76.4Dec 2028In study
Lytton Springs SolarLytton Springs (#9074) – Fayette Plant (#7055) 345 kV LineSMT Lytton Springs LLCSolar55.3Dec 2028In study
Demeter SolarTap 138kV 7224 LULING - 7216 LOCKHARTDemeter Solar, LLCSolar88.0Jun 2029In study
Demeter StorageTap 138kV 7224 LULING - 7216 LockhartDemeter Solar, LLCBattery storage (paired with solar)65.0Jun 2029In study
Demeter Storage 2Tap 138kV 7224 LULING - 7216 LockhartDemeter Solar, LLCBattery storage (paired with solar)138.0Jun 2029In study
Bobcat Generating StationBetween (7042) ZORN & (9074) LYTTON SPRINGS Substations on ONCOR 34...Critical Grid Solutions Bobcat, LLCGas engines450.0Nov 2029In study
Ardesia StorageTap 138kV 7325 Mendoza - 7216 LockhartArdesia Storage Project LLCBattery storage (stand-alone)100.0Mar 2030In study
Caldwell County Energy Center#7051 Misty Substation 345kVCaldwell County Energy Center, LLCGas combined cycle1,500.0Apr 2030In study
Metro BESS138 kV LYTTON8 (9075)Metro BESS LLCBattery storage (stand-alone)200.7Dec 2030In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Caldwell County?

FEMA flood maps for Caldwell County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Caldwell County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 11

Bastrop · Blanco · Burnet · Fayette · Hays · Lee · Llano · Travis · Williamson

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.