Bastrop County, Texas: solar, wind, and storage permits

Contacts checked 2026-09-26 · From official state and federal directories

Who to call and what to check for a solar, wind, or battery storage project in Bastrop County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.

Who handles property records and taxes in Bastrop County?

The Bastrop County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.

Bastrop County directory (Texas Comptroller)Lease rates and rollback taxes

Which TCEQ office covers Bastrop County?

TCEQ Region 11, Austin
12100 Park 35 Circle, Bldg A, Rm 179, Austin TX 78753
Main line: 512-339-2929 · Spills, 24 hours: 800-832-8224

Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.

TCEQ region directoryConstruction stormwater permit

Does Bastrop County have zoning or a solar permit?

Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.

What energy projects are proposed in Bastrop County?

ERCOT's August 2026 interconnection report lists 14 proposed energy projects in Bastrop County (3 solar, 4 battery storage and 7 gas), about 5,098 MW in all. 10 of the 14 have a signed interconnection agreement, and 2 have been energized or approved to connect.

Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.

Scroll the table sideways to see every column.

Project and connection pointDeveloperTypeMWProjected in serviceStage
Big Star SolarTap 345kV 9074 Lytton - 9073 HolmanRWE Solar Development, LLCSolar203.1Sep 2026Approved to connect
Big Star StorageTap 345kV 9074 Lytton - 9073 HolmanRWE Solar Development, LLCBattery storage80.0Sep 2026Approved to connect
Waterloo BESS 1Tap 345-kV 7040 Austrop to 7042 ZornWaterloo BESS, LLCBattery storage (paired with solar)120.0Dec 2027Signed Sep 2024
Waterloo Solar 1Tap 345-kV 7040 Austrop to 7042 ZornWaterloo Solar 1, LLCSolar200.6Dec 2027Signed Sep 2024
Bastrop Peaking Generators (TEF-Due Diligence)7048 L_GARFIE5_1Y 345kVMPH Bastrop Peakers, LLCGas turbine1,104.0Dec 2027Signed Dec 2025
Sim Gideon Combined Cycle(#7310) SIM GIDEON 138 kVLCRAGas combined cycle880.0Dec 2030Signed Dec 2025
SIM GIDEON GAS RICE(#7310) SIM GIDEON 138 kVLCRAGas engines226.0May 2031Signed Dec 2025
LOST PINES GAS RECIP(#170174) LOST PINES 345 kVLCRAGas engines113.0Jun 2033Signed Dec 2025
LOST PINES GAS RECIP PHASE 2(#170174) LOST PINES 345 kVLCRAGas engines113.0Jun 2033Signed Dec 2025
Lost Pines Power Park(#170174) LOST PINES 345 kVLCRAGas combined cycle880.0Jun 2033Signed Dec 2025
Little Star Solar#9043 CISTERN 345kVRWE Clean Energy Development, LLCSolar61.6Dec 2027In study
Techne BESS7560 RED ROCK 138kVTechne BESS, LLCBattery storage (stand-alone)202.7Dec 2028In study
Fort Worth Power Core Bastrop Gas PlantTap 345kV 7042 ZORN - 7040 AUSTROPFort Worth Power Core LLCGas combined cycle506.4Sep 2029In study
LUND STORAGE CENTER 1TAP 138 KV LINE AND CREATE NEW BUS BETWEENLund Storage Center 1, LLCBattery storage (stand-alone)407.6Oct 2029In study

Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.

Where are the flood maps for Bastrop County?

FEMA flood maps for Bastrop County

How does a project here connect to the grid?

Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.

Interconnection by market and utilityERCOT resource integration

What state and federal reviews can apply?

Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.

Statewide and federal contactsTexas decommissioning law

Check a specific property in Bastrop County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Open Quicksand Check

Other counties served by TCEQ Region 11

Blanco · Burnet · Caldwell · Fayette · Hays · Lee · Llano · Travis · Williamson

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not legal advice. Found an error? Let us know.