Dickens County, Texas: solar, wind, and storage permits
Who to call and what to check for a solar, wind, or battery storage project in Dickens County. Texas has no statewide siting permit for solar or wind, so the key contacts are the appraisal district, state environmental offices, the grid operator, and the county itself.
Who handles property records and taxes in Dickens County?
The Dickens County appraisal district keeps parcel records and decides agricultural or wildlife valuation, which a solar or storage lease can end, triggering rollback taxes. The Texas Comptroller lists the district's and the county tax office's phone, email, address, and website, plus local taxing districts such as groundwater conservation districts.
Dickens County directory (Texas Comptroller)Lease rates and rollback taxes
Which TCEQ office covers Dickens County?
TCEQ Region 2, Lubbock
5012 50th St, Ste 100, Lubbock TX 79414-3426
Main line: 806-796-7092 · Spills, 24 hours: 800-832-8224
Construction that disturbs 1 acre or more needs coverage under TCEQ's Construction General Permit (TXR150000) and a stormwater pollution prevention plan.
TCEQ region directoryConstruction stormwater permit
Does Dickens County have zoning or a solar permit?
Texas counties generally do not have zoning authority, and the state has no siting permit for solar or wind generation. Projects are usually shaped instead by site control, road use agreements with the county, tax agreements, and utility interconnection. If the county takes part in FEMA's flood insurance program, its floodplain administrator issues development permits in mapped flood zones. Ask the county judge's office or commissioners court about road use and any local requirements.
What energy projects are proposed in Dickens County?
ERCOT's August 2026 interconnection report lists 9 proposed energy projects in Dickens County (5 solar, 1 wind and 3 battery storage), about 2,317 MW in all. 7 of the 9 have a signed interconnection agreement.
Got an offer? Check whether the company or project appears here. A listing means a developer asked ERCOT to study connecting it to the grid; many listed projects are never built, and projects further along are more likely to proceed.
Scroll the table sideways to see every column.
| Project and connection point | Developer | Type | MW | Projected in service | Stage |
|---|---|---|---|---|---|
| Donegal Solar59904 Cottonwood 345kV | HE-Cottonwood Solar LLC | Solar | 201.6 | Nov 2028 | Signed; security posted |
| Spurland Solar I59908 Nova Prime 345 345kV | Spurland Solar I | Solar | 302.1 | Dec 2028 | Signed; security posted |
| Wolf Spring SolarTap 345kV 59904 Cotton Wood - 23922 White River Ckt 1 | Wolf Spring Solar, LLC | Solar | 195.8 | Aug 2028 | Signed Aug 2024 |
| Wolf Spring StorageTap 345kV 59904 Cotton Wood - 23922 White River Ckt 1 | Wolf Spring Solar, LLC | Battery storage (paired with solar) | 202.7 | Aug 2028 | Signed Aug 2024 |
| Spurland Solar II59908 Nova Prime 345 345kV | Spurland Solar II | Solar | 201.6 | Dec 2028 | Signed Aug 2026 |
| Sanders Hollow Energy CenterTap 345 kV 59904 Cottonwood (W_CW_345) - 60500 Edith Clarke (EDITHC... | Sanders Hollow Energy Center, LLC | Wind | 292.6 | Jun 2029 | Signed Jun 2026 |
| Outrider BESSTap 345 kV 59904 Cottonwood (W_CW_345) - 60500 Edith Clarke (EDITHC... | Sanders Hollow Energy Center, LLC | Battery storage (stand-alone) | 302.0 | Jun 2029 | Signed Jun 2026 |
| CORUSCANT BESSTap 345kV 59904 COTTONWOOD - 60500 EDITHCLA7A | AEU Battery Project III LLC | Battery storage (stand-alone) | 417.8 | Apr 2027 | In study |
| Timberlakes Solar59904 Cottonwood 345kV | Donegalsol | Solar | 200.7 | Nov 2028 | In study |
Stage: In study means ERCOT is still studying the connection; Signed means the interconnection agreement is signed; security posted means the developer has also posted financial security and a notice to proceed; Energized and Approved to connect mean ERCOT has approved the project to energize or synchronize with the grid. "Self-limiting" batteries are reported as 0 MW because they are sized below the site's total capacity. Source: ERCOT Generator Interconnection Status (GIS) Report, August 2026. ERCOT prepares this report for planning purposes from data entered by developers and transmission providers, and notes it may contain errors or be out of date.
Where are the flood maps for Dickens County?
FEMA flood maps for Dickens County
How does a project here connect to the grid?
Most of Texas is on the ERCOT grid, but parts of the Panhandle and northeast Texas are in SPP, parts of east Texas are in MISO, and El Paso is in the western grid. The serving utility decides which process applies.
Interconnection by market and utilityERCOT resource integration
What state and federal reviews can apply?
Depending on the site: wetland permits from the U.S. Army Corps of Engineers, endangered species review through U.S. Fish and Wildlife, historic review through the Texas Historical Commission, wildlife comments from Texas Parks and Wildlife, and FAA notice for tall structures like wind turbines.
Statewide and federal contactsTexas decommissioning law
Check a specific property in Dickens County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 2
Bailey · Cochran · Crosby · Floyd · Garza · Hale · Hockley · King · Lamb · Lubbock · Lynn · Motley · Terry · Yoakum