Developers screen land on a handful of questions. If you know the answers before anyone calls, you can tell a serious offer from a fishing expedition. Items marked Quicksand Check covers this are checked for free by Quicksand Check at any spot you click.
1. Size and shape
- Enough acres. Utility-scale solar typically uses about 5 to 7 acres per megawatt (Bear Claw Land Clearing, 2026), and developers commonly want at least 20 to 50 acres, preferring 100 or more (SmartEnergyUSA). Quicksand Check covers this in Texas
- A compact shape. Long, narrow, or chopped-up parcels lose usable ground to setbacks and access roads.
- Buildable area after constraints. Subtract wetlands, floodplain, steep ground, pipelines, and required setbacks. What remains is what a developer will actually pay for.
2. Grid access (usually the deciding factor)
- Distance to a transmission line or substation. Every mile of new line adds cost and more easements to negotiate. Quicksand Check's standout test looks for a mapped line within half a mile. Quicksand Check covers this
- Room on the line. Being near a line does not mean it can take a new project. Only interconnection studies by the utility or grid operator answer this, and it is the most common reason projects stall.
- Voltage that fits the project. Larger projects need higher-voltage lines. Quicksand Check shows the voltage of the nearest mapped line when the federal map lists it.
The federal transmission map Quicksand Check uses was last updated in 2022 (data.gov). Lines are long-lived, but very new ones may be missing.
3. The ground itself
- Gentle slope. Industry design guidance says trackers work best under about 5 to 10 percent slope, with fixed-tilt racking tolerating somewhat more (SurgePV design guide). This is guidance, not a rule. Quicksand Check covers this
- Outside FEMA flood zones, or mostly outside. Building in a special flood hazard area requires a floodplain permit from the local community (44 CFR 60.3). Quicksand Check covers this
- No wetlands where panels would go. Filling a jurisdictional wetland needs a Clean Water Act Section 404 permit (EPA). The national wetland map is a screen, not a legal determination. Quicksand Check covers this
- Workable soils and drainage for foundations and roads. USDA soil survey data is the starting point. Quicksand Check covers this
- Road access for construction trucks and cranes.
4. Environmental and cultural
- Critical habitat nearby? The designation matters mainly when a project needs a federal permit or funding (U.S. Fish & Wildlife Service). Quicksand Check covers this
- Historic sites nearby? Federal permits or funding bring a Section 106 historic review (ACHP). Quicksand Check covers this
- Prime farmland? USDA rates soils; some states and counties add conditions for solar on prime farmland. Quicksand Check covers this
5. Title, minerals, and taxes (Texas)
- Who owns the minerals and groundwater? In Texas those estates are dominant: their owners can use as much of the surface as reasonably necessary to produce oil, gas, or water. Developers will look closely at who holds them and whether they are leased (Texas A&M AgriLife).
- Ag or wildlife tax valuation. A solar lease can end special valuation and trigger a rollback, where the difference in taxes comes due. A State Bar of Texas article advises having the lease require the company to cover any added property taxes, including personal property taxes on the equipment (State Bar of Texas).
- Clear title. No conflicting easements, liens, or ownership disputes.
- Local rules. Texas has no statewide solar siting permit, but cities and some counties have rules. Quicksand Check shows who approves projects in each state.
Before you sign anything: Texas A&M's agricultural law specialists recommend having practical, experienced legal counsel review any solar lease (
Texas A&M AgriLife). This checklist is general information, not legal advice.